Cripple Creek&Victor Gold Mining Company <br /> Squaw Gulch VLF Phase 2A Part 3 <br /> Record of Construction Report ■ <br /> 475.0106.032 <br /> July 2,2020 <br /> LIST OF APPENDICES <br /> Appendix A Staff Schedule for CQA Monitor Personnel <br /> Appendix B Surveyor's Professional License <br /> Appendix B.1 Edward James Surveyor's Professional License <br /> Appendix B.2 Foresight West Surveyor's Professional License <br /> Appendix C Technical Specifications <br /> Appendix D Structural Fill Method Specifications <br /> Appendix E Soil Liner Fill Acceptance Forms <br /> Appendix F Weekly Reports <br /> Appendix G Photographic Documentation <br /> Appendix G.1 Photograph Log <br /> Appendix G.2 Construction Photographs <br /> Appendix H Laboratory Test Results <br /> Appendix H.1 Structural Fill Laboratory Test Results <br /> Appendix H.2 Soil Liner Fill Laboratory Test Results <br /> Appendix H.3 Drain Cover Fill Laboratory Test Results <br /> Appendix H.4 Drain Cover Fill (Crushed Ore) Laboratory Test Results <br /> Appendix I Geosynthetics Quality Control Documents and Inventory <br /> Appendix 1.1 80 mil LLDPE Geomembrane Inventory Control <br /> Appendix 1.2 Resumes of Installation Personnel <br /> Appendix 1.3 80mil LLDPE Geomembrane Roll QC Certificates <br /> Appendix 1.4 80mil LLDPE Geomembrane Resin QC Certificates <br /> Appendix 1.5 Welding Rod Quality Control Certificates <br /> Appendix J Geomembrane Installation Summaries <br /> Appendix J.1 Geomembrane Deployment Summary <br /> Appendix J.2 Geomembrane Trial Seam Summaries <br /> Appendix J.2.1 Geomembrane Fusion Trial Seam Summary <br /> Appendix J.2.2 Geomembrane Extrusion Trial Seam Summary <br /> Appendix J.3 Geomembrane Fusion Welding Summary <br /> Appendix J.4 Geomembrane Extrusion Welding Summary <br /> P:\Projects\0106.032 VLF2 Phase 2 CQA\J-REPORTS\Cert Report-Phase 2A Part 3\475.0106.032 CCV PHASE 2A Part 3 ROC <br /> REPORT.docx <br />