Laserfiche WebLink
Cripple Creek&Victor Gold Mining Company <br /> Squaw Gulch VLF Phase 2A Part 3 <br /> Record of Construction Report ■ <br /> 475.0106.032 <br /> July 2,2020 <br /> Appendix J.5 Geomembrane Destructive Testing Summaries <br /> Appendix.1.5.1 Geomembrane Fusion Destructive Testing Summary <br /> Appendix J.5.2 Geomembrane Extrusion Destructive Testing Summary <br /> Appendix J.6 Geomembrane Pressure Testing Summary <br /> Appendix J.7 Geomembrane Defect/Repair Summary <br /> Appendix J.8 Geomembrane Acceptance Forms <br /> Appendix K Third Party 80mil LLDPE Geomembrane Conformance Testing Results <br /> Appendix L Tensiometer Certifications <br /> P:\Projects\0106.032 VLE2 Phase 2 CQA\1-REPORTS\Cert Report-Phase 2A Part 3\475.0106.032 CCV PHASE 2A Part 3 ROC <br /> REPORT.docx <br />