Laserfiche WebLink
Cripple Creek&Victor Gold Mining Company <br /> Squaw Gulch VLF Phase 2A Part 3 <br /> Record of Construction Report ■ <br /> 475.0106.032 <br /> July 2,2020 <br /> RECORD OF CONSTRUCTION DRAWINGS <br /> Sheet No. 1 of 2 SOIL LINER FILL AS-BUILT 1 OF 2 <br /> Sheet No. 2 of 2 SOIL LINER FILL AS-BUILT 2 OF 2 <br /> Sheet No. 1 of 2 HIGH VOLUME COLLECTION PIPE <br /> AS-BUILT 1 OF 2 <br /> Sheet No. 2 of 2 HIGH VOLUME COLLECTION PIPE <br /> AS-BUILT 2 OF 2 <br /> r DRAWING NO. 5 GEOMEMBRANE PANEL LAYOUT AS-BUILT <br /> DRAWING NO. 6 DRAIN COVER FILL AS-BUILT ISOPACH <br /> LIST OF TABLES <br /> Table 1 Summary of Earthworks Material Specifications <br /> Table 2 Earthworks Testing Summary and Frequency <br /> Table 3 Summary of Weather Data <br /> Table 4 Fill Temperature Monitoring Summary <br /> Table 5 CQA Earthworks Laboratory Testing Summary—Structural Fill <br /> Table 6 CQA Earthworks Laboratory Testing Summary—Soil Liner Fill <br /> Table 7 CQA Earthworks Laboratory Testing Summary—Drain Cover Fill <br /> Table 8 CQA Earthworks Laboratory Testing Summary—Drain Cover Fill (Crushed Ore) <br /> Table 9 Nuclear Gauge Moisture-Density Testing Summary—Soil Liner Fill <br /> Table 10 Soil Liner Fill Depth Verification Summary <br /> LIST OF FIGURES <br /> Figure 1 Site Location <br /> Figure 2 Certification and Geomembrane Installation Limits <br /> Figure 3 Destructive Sample Test Codes for Dual Hot Wedge Fusion Welds <br /> Figure 4 Destructive Sample Test Codes for Extrusion Welds with Leister Heat <br /> Seams <br /> P:\Projects\0106.032 VLF2 Phase 2 CQA\1-REPORTS\Cert Report-Phase 2A Part 3\475.0106.032 CCV PHASE 2A Part 3 ROC <br /> REPORT.docx <br />