Laserfiche WebLink
Demo Worksheet Cont'd Task # TTT <br />TRUCK/LOADER TEAM WORK <br />Page 11 of 143 <br />Task description: King I - haul topsoil/growth medium to Upper Facilities Area <br />Site: King Coal Mine Permit Action: RN7 Permit/Job#: C1981035 <br />PROJECT IDENTIFICATION <br />Task #: 004 State: Colorado <br />Date: 5/3/2017 County: La Plata <br />User: JHB <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Truck Loader Team -Truck: Generic 10-12 cy, 6x4 <br />-Loader: OBSOLETE - CAT 938H <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance —Motor Grader: NA <br />-Water Truck: NA <br />Abbreviation: None <br />Filename: C035-004 <br />Shift basis: 1 per day <br />f nrt RrPakdnwn- Tmrk/T.narlPr Team Sunnnrt F.nuinment Maintenance Fouinment <br />Total work team cost/hour: $215.69 <br />MATERIAL OUANTITIES <br />Initial volume: 1,581 CCY <br />Loose volume: 1,842 LCY <br />Source of estimated volume: 1.96 acres x 6" <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />Swell factor: 1.165 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: 2,850 Pounds/LCY <br />Description: User Provided <br />Rated Payload: 35,400 Pounds <br />CIRCES Cost Estimating Software <br />Truck <br />Loader <br />Load Area <br />Dump Area <br />Motor <br />Grader <br />Water Truck <br />%Utilization -machine: <br />100 <br />100 <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$18.29 <br />$25.66 <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$39.97 <br />$32.31 <br />NA <br />NA <br />NA <br />NA <br />%Utilization -riper: <br />NA <br />0 <br />NA <br />NA <br />NA <br />NA <br />Ripper own. <br />cost/hour: <br />NA <br />$0.00 <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$0.00 <br />$41.20 <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$58.26 <br />$99.17 <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />2 <br />1 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: $215.69 <br />Support: $0.00 <br />Maint: $0.00 <br />Total work team cost/hour: $215.69 <br />MATERIAL OUANTITIES <br />Initial volume: 1,581 CCY <br />Loose volume: 1,842 LCY <br />Source of estimated volume: 1.96 acres x 6" <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />Swell factor: 1.165 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: 2,850 Pounds/LCY <br />Description: User Provided <br />Rated Payload: 35,400 Pounds <br />CIRCES Cost Estimating Software <br />