Laserfiche WebLink
Demo Worksheet Cont'd <br />Task # TTT Page 10 of 143 <br />Weight description: Decomposed rock - 50% <br />Rock, 50% Earth <br />Job Condition Correction Factor <br />Source <br />Operator Skill: <br />0.750 <br />(AVG.) <br />Material consistency: <br />1.200 <br />(CAT HB) <br />Dozing method: <br />1.000 <br />(GEN.) <br />Visibility: <br />1.000 <br />(AVG.) <br />Job efficiency: <br />0.830 <br />(1 SHIFT/DAY) <br />Spoil pile: <br />0.800 <br />(FND-RF) <br />Push gradient: <br />1.000 <br />(CAT HB) <br />Altitude: <br />1.000 <br />(CAT HB) <br />Material Weight: <br />0.793 <br />(CAT HB) <br />Blade type: <br />1.000 <br />(PAT) <br />Net correction: 0.4739 <br />Adjusted unit <br />production: <br />Adjusted fleet <br />production: <br />JOB TIME AND COST <br />233.11 LCY/hr <br />233.11 LCY/hr <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.886/LCY <br />Total job time: 16.28 Hours <br />Total job cost: $3,362 <br />CIRCES Cost Estimating Software <br />