My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-06-16_PERMIT FILE - C1981035 (15)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981035
>
2020-06-16_PERMIT FILE - C1981035 (15)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 6:50:05 PM
Creation date
7/6/2020 6:39:31 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035
IBM Index Class Name
Permit File
Doc Date
6/16/2020
Section_Exhibit Name
KII Appendix 12 Reclamation Bond Estimate
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
166
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Demo Worksheet Cont'd Task # TTT Page 9 of 143 <br />BULLDOZER WORK <br />Task description: King I - push ripped waste to tipple highwall <br />Site: King Coal Mine Permit Action: RN7 Permit/Job#: C1981035 <br />PROJECT IDENTIFICATION <br />Task #: 003 State: Colorado <br />Date: 5/3/2017 County: La Plata <br />User: JHB <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat D8T - 8SU <br />Horsepower: <br />310 <br />Blade Type: <br />Semi -Universal <br />Attachment: <br />3 -shank ripper <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper own. <br />Cost/Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/Hour: <br />Abbreviation: None <br />Filename: C035-003 <br />$83.81 <br />Utilization % <br />NA <br />$66.17 <br />100 <br />$7.55 <br />NA <br />$7.21 <br />100 <br />$41.85 <br />NA <br />Total unit Cost/Hour: $206.59 <br />Total Fleet Cost/Hour: $206.59 <br />MATERIAL OUANTITIES <br />Initial Volume: 3,794 <br />Swell factor: 1.000 <br />Loose volume: 3,794 LCY <br />Source of estimated volume: <br />Source of estimated swell <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />Materials consistency <br />description: <br />Average push <br />gradient: <br />Average site altitude: <br />Material weight: <br />Volume from Task 002, 20% swell <br />Cat Handbook <br />200 feet <br />491.9 LCY/hr <br />Loose stockpile 1.2 <br />0% <br />7,400 feet <br />2.900 lbs/LCY <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.