My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-06-16_PERMIT FILE - C1981035 (15)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981035
>
2020-06-16_PERMIT FILE - C1981035 (15)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 6:50:05 PM
Creation date
7/6/2020 6:39:31 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035
IBM Index Class Name
Permit File
Doc Date
6/16/2020
Section_Exhibit Name
KII Appendix 12 Reclamation Bond Estimate
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
166
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Demo Worksheet Cont'd <br />Payload Capacity: 12.42 <br />Truck Bed (volume) Basis: <br />Task # TTT <br />LCY <br />Page 12 of 143 <br />Struck Volume: 10.00 LCY <br />Heaped Volume: 12.00 LCY <br />Average Volume: 11.00 LCY <br />Adjusted Volume: 12.00 LCY <br />Final Truck Volume Based on Number of Loader Passes: 11.41 <br />Loading Tool Capacity <br />Bucket Size Class: NA <br />Rated Capacity: 3.900 LCY (heaped) <br />Bucket Fill Factor: 0.975 Loose material - mixed moist aggregates (95-100%) 0.975 <br />Adjusted Capacity: 3.803 LCY <br />Job Condition Corrections: Site Altitude (ft.): 7400 feet <br />Truck Loader Source <br />Altitude Adj: 1.000 1.000 (CAT HB) <br />Job Efficiency: 0.830 0.830 (CAT HB) <br />Net Correction: 0.830 0.830 <br />Loadine Tool Cycle Time: Number of Loading Tool Passes Required to Fill 3 <br />Excavators and Front Shovels: Truck: <br />Machine Cycle Time vs. Job Condition Rating: NA <br />Selected Value within this Basic Rating: NA <br />Track Loaders — Material Description: <br />Cycle Time Elements (min.): <br />Load: NA Maneuver: NA Dump: 0.100 <br />Wheel and Track Loaders - Unadjusted Basic Loader Cycle Time (load, dump, 0.483 <br />maneuver): <br />LCY <br />passes <br />minutes <br />Cycle Time Factors <br />Net Cycle Time Adjustment: -0.090 <br />Factor (min.) <br />Source <br />Material: <br />Material 1/8" to 3/4" diameter -0.02 <br />-0.020 <br />(Cat HB) <br />Stockpile: <br />Conveyor or dozer piled 10 ft. high or less <br />0.010 <br />(Cat HB) <br />Truck Exchange Time: 0.50 <br />0.01 <br />0.500 Minutes <br />Truck Load Time: 0.885 <br />Truck Ownership: <br />Common ownership of trucks and loaders - <br />-0.040 <br />(Cat HB) <br />0.900 Minutes <br />0.04 <br />Operation: <br />Constant operation -0.04 <br />-0.040 <br />(Cat HB) <br />Dump Target: <br />Nominal target 0.00 <br />0.000 <br />(Cat HB) <br />CIRCES Cost Estimating Software <br />Net Cycle Time Adjustment: -0.090 <br />minutes <br />Adjusted Loader Cycle Time: 0.393 <br />minutes <br />Net Load Time per Truck: 0.885 <br />minutes <br />Truck Cycle Time: <br />Truck Exchange Time: 0.50 <br />Minutes Adjusted for site altitude: <br />0.500 Minutes <br />Truck Load Time: 0.885 <br />Minutes Adjusted for site altitude: <br />0.885 Minutes <br />Truck Maneuver and Dump 0.90 <br />Minutes Adjusted for site altitude: <br />0.900 Minutes <br />Time: <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.