My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-05-28_REVISION - M1983033
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1983033
>
2020-05-28_REVISION - M1983033
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 7:55:28 PM
Creation date
6/3/2020 10:46:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983033
IBM Index Class Name
REVISION
Doc Date
5/28/2020
Doc Name
Concurrence Correspondence
From
Environment, Inc.
To
DRMS
Type & Sequence
AR1
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
z <br /> E. SI_O1'E <br /> Adherence to currently adopted Best Management Practices(BMPs)shall be required \\here applicable. N w <br /> Ld <br /> All side slopes and banks in soil shall be constructed to maintain a slope not steeper than i 112:1 (one and one-half units " <br /> of horizontal length to one unit of vertical length)or shall be designed by a licensed engineer. in areas of solid rock, N 0 <br /> 1111-4 <br /> slopes may be cut on a 1/3:1 (one-half units of horizontal length to one unit ol'vertical length). Open rock cuts greater <br /> W. <br /> than ten (10) feet in height and steeper than I/2:1 slope,or greater than twenty(20) feet in height and steeper than I:I ° U <br /> slope. shall be designed by it licensed engineer. All slopes shall be made stable to prevent rock or soil slides from �a <br /> occurrin_. ..m 1111171111 <br /> Proposed uses are identified to be located in an area where slopes are between 0-Mo.The applicant will be °- <br /> required to comply with the County's Best Management Practices. am <br /> mm <br /> F. DEVELOPMENT REVIEW <br /> Proposals for new developments in an industrial zoning district shall be required to comply with Section 20- m� <br /> Development Review of these Regulations. I f a rezoning or other land use process is required for a proposed to o <br /> development, the Development Review process may be done concurrently with that process. N0 <br /> According to Section 20-Development Review of the Clem-Ci-eek Count,Zonin Regittalrnns, the applicant's LO <br /> proposal does not "trigger" Development or- Design Review, based on the total proposed and existing square N <br /> footage of'3.627 square feet, which falls under the 7,500 square foot threshold limit. 'fhe proposal does not o r—M <br /> "trigger" Development or Design Review, based on the expected average daily trip value of 92, which falls under (D <br /> LO <br /> the 100 ADT threshold limit. The proposal does not"trigger"Development or Design Review, based on the N o,-= <br /> applicant's assertion that no site disturbance is proposed. According to Otto Van Geet, P.E., site disturbance for NNa <br /> the ISDS will be limited to the 480 square foot leach field. <br /> G. ANIMALS <br /> Shall be in compliance with Section 21 - Animals of these Regulations. <br /> No animals are expected to reside on file subject property. <br /> H. FENCiNG/WALLS <br /> Shall be in compliance with Section 15 - fencing, Walls,and Landscaping Standards of these Regulations. <br /> No fencing or wall construction is anticipated and landscaping is not proposed, at this time. <br /> L PARKING <br /> I. Shall be in compliance with Section 14-Off-Strect Parting Requirements of these Regulations; <br /> As pet-Section 14(A)(5)(1))(iN,)(b)-011-Street Parking for i\ylanufacturiug/Intlush ial,one(1)off-street parking <br /> space shall be provided I'or each employee at the largest shift,plus one (1)space for every 1,000 feet of gross floor <br /> area. As pet- the site plan attached as Exhibit B, six (6)employee parking spaces have been provided for the <br /> concrete batch plant facility, which exceeds the required live(5) parking spaces necessary,as per the number of <br /> employees noted in the narrative.The total square footage for the building to house computers,office, and storage <br /> of concrete additives is proposed to have a total square footage of 1,200 square feet. Therefore,an additional 1.2 <br /> spaces would be required, as per Section 14(A)(5)(b)(ix)(b)-Off-Street Parking for Manufacttn-ing/industrial. <br /> Therefore, the applicant has met the required off-street parking spaces for this proposal. <br /> One employee works for the log yard facility, therefore,as per Section 14(A)(5)(1))(ix)(1))-011'-Street Parking For <br /> 1�lanul'acturing/IudusUial. 2.8 parking spaces shall be required for the log lard use. As per the site plan attached <br /> as Exhibit 13, three (3) parking spaces are provided. <br /> 2. Parking associated with on-site uses shall not overflow into public rights-of-tivay; <br /> Overflow parking into public rights-of-way is not expected. <br /> 3. Off-street parking shall be provided to meet the needs of the proposed uses. <br /> J. DRIVEWAYS <br /> All new or reconstructed driveways and new private roadways require a Driveway Permit and must be built to County <br /> road and driveway design standards, unless mitigated pursuant to Wildfire Mitigation Requirements. Slope stabilization <br /> and revegetatUn may be required, pursuant to the COtlnty's adopted Best tMamigemcm Practices(BMPs). <br /> No nely or reconstructed di-iveways or new private roadways are expected. <br /> November 22, 2006 Page 4 of 8 Modified 12Oember2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.