Laserfiche WebLink
13. The Planning Commission identified that they were concerned about the potential For%vater quality inpacts to Clear <br /> Creek. due to crash out areas on the subject property.The applicant has addressed this concern by revising their site plan, r <br /> attached as Exhibit B. to create a specific area for wash out purposes, in conjunction with the drainage plan required by J <br /> the Site Development Department. w v <br /> 14. The applicant has offered to operate the Concrete Batch:Plant Facility,during tile following hours: U. <br /> Concrete Batch Plant Facility Operations shall be permitted from 6:00 am to 6:00 pm on weekdays and from 8:00 am to M a <br /> 6:00 pm on Saturdays from March 2 to December 20. From December 21 to March I the permitted hours for Concrete a�E <br /> Batch Plant Facility operations are from 7:00 am to 5:30 pm on weekdays and from 8:00 am to 6:00 pm on Saturdays. <br /> In <br /> 'The concrete batch plant operator may extend these hours on weekdays or Saturdays with prior approval of the Planning W m <br /> department where the economy of operations is involved. Such approval shall not be granted if past extensions have m'� <br /> resulted in complaints from property owners in the vicinity. In no event shall Concrete Batch Plant Facility operations <br /> occur on Sundays, nor on the following Holidays: New Years Day, Memorial Day,.luly 4"', Labor Day,Thanksgiving, aim t <br /> and Christmas. Mm� <br /> ts—J <br /> 15. The applicant has identified that the enclosure of the concrete batch plant lacility does not mitigate the emission of <br /> dust particulate matter and is normally required for aesthetic purposes.The applicant a.trees that if there are complaints tom!_= <br /> related to air quality, due to operation of the concrete batch plant facility, the applicant has agreed to mitigation N� <br /> measures, such as but not limited to the following methods: "1� <br /> Mae <br /> a.)Enclosure of the conveyer belt system. CD e <br /> b.)installation of a spray system to apply moisture to the products delivered on the conveyer belt system. C*4 <br /> c.) Enclosure of the area below the materials hopper,cohere potential dust emissions have been identified as 0!'�_-0 <br /> potential]),occurring. LOr'_ <br /> N & <br /> 16,The applicant has provided the following contact information to the Planning Department,so that complaints can be Na <br /> handled in an expedient manner: Sue E chen, Everist Materials, Incorporated,(970)468-2521. <br /> CONDITIONS OF APPROVAL <br /> 1.)The applicant shall convey an easement to Clear Creek County to be located between Clear Creek and U.S. Hwy. 6 on <br /> the subject property,as shown on Exhibit A, for the Cicar Creek County Greenway Trail.The easement location shall be <br /> granted and depicted on Exhibit B. prior to recordation of this Resolution. <br /> 2.)Air Pollution Emission Notice(AI'F.N) <br /> A.)A copy of the Air Pollution Emission Notice(APE\)shall be submitted to the Planning Department by December I, <br /> 2006, <br /> B.) If die AI'EN is revised or renewed,it copy of the new APEN shall be submitted to the Planning Department within <br /> thirty(30)days from the issuance of the revised and/or renewed APEN. <br /> C.) If the concrete batch plant is no longer considered exempt fi-om permitting requirements by the Colorado Department <br /> of Public Health and Environment, it copy of the Initial Approval Permit from the Colorado Department of Public Health <br /> and Environment shall be submitted to the Planning Departnent immediately upon issuance. <br /> D.)If the concrete batch plant is no longer considered exempt from permitting requirements by the Colorado Department <br /> of Public Health and Environment,a copv of the Final Approval Permit from the Colorado Department of Public Health <br /> and Environment shall be submitted to the Planning Department, within six(6)months from the issuance of the Initial <br /> Approval Permit. <br /> 3.) Annual Reporting Requirements <br /> A.)As per the Colorado Department of Public Health and Environment air pol-lution reporting and permitting <br /> requirements• annual records of product throughput shall be maintained for the concrete batch plant facility, in order to <br /> demonstrate compliance with the permit limits and requirements. <br /> B.)Annual records of product throughput and permit limits shall be submitted by December 31"each year to the Clear <br /> Creek County Planning Department, P.O. Box 2000,Georgetown, Colorado 80444.`fhc County may audit said reports <br /> and may enter the property to verify anmlal product throughput records at any time, lolluwing at least ten(10)days <br /> notice by mail to the address of record in the Clear Creek County Treasurer's Office. <br /> C.) Any and all air pollution complaints that ensued over the annual report time period shall be documented. including <br /> the results of these complaints,and submitted by December 31"each year to the Clear Creek County Planning <br /> Department, P.O. [fox 2000.Georgetown, Colorado h0444. <br /> D.)Any and all air pollution notices of violation by any prevailing authority of the County or State shall be documented, <br /> including the results of these violations,and submitted by December 3 1"each year tothe Clear Creek County Planning <br /> Department. 1'.0. Box 2000.Geor_geiown.Colorado 80444. <br /> November 22, 2006 Page 7 of 8 Modified 12Oember2003 <br />