Laserfiche WebLink
4.) If there are complaints related to air quality,due to operation of the concrete batch plant facility. the applicant has <br /> agreed to mitigation measures.such as but not limited to the following methods: <br /> a.) Enclosure of the conveyer belt system. z <br /> b.) Installation of a spray system to apply moisture to the products delivered on the conveyer belt system. J <br /> c.) E11CI0Su1-e of the area below the materials hopper, where potential dust emissions have been identified as 0 a <br /> potentially occurring. w� v— <br /> v <br /> N L(� <br /> (M A— <br /> ADOPTED this 22"`I day of November,2006.at a regular meeting of the Clear Creek Board of County °) <br /> Commissioner (L _ <br /> r • <br /> ..m <br /> F-9-m— <br /> am <br /> 'evit .l. M u•mal T in <br /> Mm <br /> m <br /> (D B —� <br /> /. QO <br /> • <br /> Harry Dale,C imissioner N <br /> (o <br /> mm_ � <br /> N <br /> O W—® <br /> ( WAlf= <br /> an Drury,C miO4 <br /> iiissi er LO m— <br /> q' A <br /> N❑. <br /> n <br /> Attest: AVir-ole-d - <br /> RobertDeputy Clcrk and 1 cor er 1_oefner,County i XT)i y <br /> November 22, 2006 Page 8 of 8 Vtodilied 12 October_2005 <br />