Laserfiche WebLink
equipment are covered under their own portable plant SPCC Plans. If any fuel spill is <br /> encountered,the material will be removed from the site. The Division will be notified in the case <br /> of any spill. Upon final reclamation, all equipment will be removed from the site. <br /> The asphalt plant will consist of burner fuel tanks, asphalt cement tanks, mixer drum, storage <br /> silos, loading hopper and a control room. Asphalt batching operation will only be conducted in <br /> the warmer months as it can only be installed in these months. Excess asphalt produced during <br /> batching operations as well as spillage will be cleaned up daily and placed in an asphalt material <br /> storage location. The asphalt material will be directly recycled into the mixer drum during <br /> further asphalt production runs. <br /> Control rooms for the plants,truck scale, and office trailer will be the only other structures on <br /> site. Portable toilets and potable water will be brought on site for employee use, and serviced by <br /> a contractor. <br /> Maintenance vehicles will visit the site regularly to provide oil, grease, and perform other minor <br /> maintenance on vehicles and equipment. Any major equipment repair work will be performed off <br /> site. <br /> The following list is the best estimate of the required equipment to be used onsite throughout the <br /> mine life: <br /> 3.1.1 3.1 Gravel Crushing Equipment <br /> • Portable Jaw Crusher <br /> • Portable Cone Crusher <br /> • Portable Screen Decks <br /> • Portable Stacking/Transporting Conveyors <br /> • Water Truck for dust suppression <br /> • Portable Generators for plants <br /> • Electric Control Van <br /> • Backhoes <br /> • Wheel Loader Cat 988, Cat 980 <br /> Hayden Gravel Pit <br /> May 202� D-2. (:rrl;Iw�witki end.AssorialiY,rl,l.(' <br />