My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-05-27_REVISION - M1987164
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1987164
>
2020-05-27_REVISION - M1987164
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2025 6:54:09 AM
Creation date
5/28/2020 1:34:19 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987164
IBM Index Class Name
REVISION
Doc Date
5/27/2020
Doc Name
Request For Amendment To Permit
From
Oldcastle SW Group, Inc.
To
DRMS
Type & Sequence
AM3
Email Name
TNL
JDM
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT D MINING PLAN <br /> 1. General Mining Plan and Methods <br /> This exhibit is unchanged from the currently approved permit. Information for this exhibit can be <br /> found in the following locations of the existing permit file: <br /> Document Exhibit Subsection/iteni Pw�e Laserfiche file Laserfiche(late <br /> 112c D 1.General Mining Plan D-1 thru D-3 ! 2013-06-18_REVISION-M1987164(5) 06/18/2013 <br /> Amendment <br /> `j Application ! a <br /> L { I <br /> 2. Mining Timetable <br /> This exhibit is unchanged from the currently approved permit. Information for this exhibit can be <br /> found in the following locations of the existing permit file: <br /> Document Exhibit Subsection/item Page Laserfiche file Laserfiche date <br /> 112c Amendment D 2.Mining D-3 2013-06-18_REVISION-M1987164(5) 06/18/2013 <br /> Application Timetable <br /> 3. Mine Facilities and Operation <br /> This exhibit is essentially unchanged from the currently approved permit. The only modifications <br /> to this section concern the access road and the inclusion of the truck scale in the permit. The <br /> alignment of the access road will now be directly from the pit to US Highway 6/40 and will no <br /> longer utilize the Camilletti driveway. The western portion of the site, known as the Camilletti <br /> Pit has been reclaimed. <br /> The crushing and screening will take place within the Phase 1. Fuel will be brought on sit by fuel <br /> truck, and on-site storage will be maintained. This fuel farm will be constructed to have <br /> secondary containment of 110%capacity of all tanks stored within. The fuel tanks for crusher, <br /> screener, and asphalt plant will be stored on this fuel farm. Other individual equipment that is of <br /> a more mobile type will carry their own fuel tanks and will have secondary capacity of 110%as <br /> well. An SPCC Plan will be placed in the mine office and the employees will be trained to take <br /> the appropriate steps for inspections and spill response in case of a spill. Portable plants and <br /> Hayden Gravel Pit D-I Greg 1—icki and Associates.?IAA <br /> May 2020 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.