My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-05-20_PERMIT FILE - M2020027
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2020027
>
2020-05-20_PERMIT FILE - M2020027
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 7:30:56 PM
Creation date
5/21/2020 6:42:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2020027
IBM Index Class Name
Permit File
Doc Date
5/20/2020
Doc Name
Decision Document
From
DRMS
To
Oldcastle SW Group dba Four Corners Materials
Email Name
SJM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bulldozer Worksheet Cont'd Task 4 004 Page I of 2 <br /> BULLDOZER WORK <br /> Task description: Move stock)iles-overburden tollisoil. <br /> Site: South Fork#lPit Permit Action: Newpermit Pen-nit/Job#: M2020027 <br /> PROJECT IDENTIFICATION <br /> Task N: 004 State: Colorado Abbreviation: None <br /> Date: 5/2012020 County: Rio Grande Filename: M027-004 <br /> User, SJM <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Cat D8T-8SU <br /> Horsepower: 310 <br /> Blade Type:: S.emi-Universal. <br /> Attachment: 1-shank riper <br /> Shift Basis: I per day <br /> Data Source: NRIG). <br /> Cost : <br /> Breakdown <br /> ............ <br /> Utilization'e' <br /> Ownership Cost/Hour: $1,03-86 NA <br /> Operating Cost/Hour: $82.26 100 <br /> Ripper own. $13.90 NA <br /> Cost/Hour: <br /> Ripper op.Cos�t/Hour: $8.74 100 <br /> Operator Cost/Hour: $41.24 NA <br /> Total unit Cost/Hour: $249,99 <br /> Total Fleet Cost/Hour: $249.99 <br /> MATERIAL QUANTITIES <br /> Initial Volume: 30,000 <br /> Swell factor: 1.000 <br /> Loose volume: 30�000 LCY <br /> Source of estimated volume-, Division of Reclamation,Minin &Safety <br /> Source of estimated swell Cat Handbook <br /> factor: <br /> HOURLY PRODUCTION <br /> Average push distance: 55 feet <br /> Unadjusted hourly 1,323.4 LCY/hr <br /> production: <br /> Materials consistency description: <br /> Average push 25 % <br /> gradient: <br /> Average site altitude: 8,100 feet <br /> Material weight: 3,900 lbs/LCY <br /> Weight description: Taconite <br /> Job Condition Correction Factor Source <br />
The URL can be used to link to this page
Your browser does not support the video tag.