Laserfiche WebLink
Mobilization Worksheet Cont'd Task#003 Page 2 of 2 <br /> EQUIPMENT HAUL DISTANCE and Time <br /> Nearest Major City or Town within project area region: SOUTH FORK <br /> Total one-way travel distance: 5.00 miles <br /> Average Travel Speed: 45.00 mph <br /> Total Non-Roadable Mob/Demob Cost $1,697.45 <br /> two round trips with haul rig. <br /> Total Roadable Mob/Demob Cost $2.88 <br /> one round trip,no haul rig. <br /> Transportation Cycle Time: <br /> Non- <br /> Roadable Roadable <br /> _�uipment _,Equl�pment <br /> Haul Time(Hours): 0.11 0.11 <br /> Return Time(Hours): 0.11 0,11 <br /> Loading Time(Hours): 0.00 NA <br /> ....................................... <br /> Unloading Time(Hours): 0.00 NA <br /> Subtotals: 0.22 0.22 <br /> JOB TIME AND COST <br /> Total job time: 0.44 Hours <br /> Total job cost: $1,700 <br /> CIRCES Cost Estimating Software <br />