Laserfiche WebLink
Bulldozer Worksheet Cont'd Task#004 Page 2 of 2 <br /> Operator Skill: 0.750AV9. <br /> Material consistency: 1.200 (CAT HB) <br /> Dozingmethod: '1.20 0 SLOT .... .... <br /> Visibility: 1.000 (AVG.) <br /> Job efficiency: 0.830 (1 SHIFT/DAY) <br /> Spoil pile: 0.800 (FND-RF) <br /> Push gradient: 0.422 (CAT HB) <br /> Altitude: 1.000 (CAT HB) <br /> Material Weight: 0.590 (CAT HB) <br /> Blade type: 1.000 (PAT) _ . .. <br /> Net correction: 0.1785 <br /> Adjusted unit 236.23 LCY/hr <br /> production: <br /> Adjusted fleet 236.23 LCY/hr <br /> production: <br /> JOB TIME AND COST <br /> Fleet size: 1 Dozens <br /> Unit cost: $1.058/LCY <br /> Total job time: 126.99 Hours <br /> Total job cost $31,748 <br />