My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-05-06_GENERAL DOCUMENTS - C1981019
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981019
>
2020-05-06_GENERAL DOCUMENTS - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 6:34:53 PM
Creation date
5/12/2020 6:26:44 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
General Documents
Doc Date
5/6/2020
Doc Name
Findings & Cost Estimate
From
DRMS
To
Colowyo Coal Company LP
Type & Sequence
MT7
Permit Index Doc Type
Findings
Email Name
ZTT
JDM
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
823
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
revision was received on May 13, 2019, deemed complete on May <br />23, 2019 and approved on May 31, 2019. <br /> <br />Minor Revision 204 MR-204 updated Map 23B to delineate the Collom mining limits, <br />specifically showing the pit crest location. The revision was received <br />on May 4, 2015, deemed complete on May 14, 2015 and approved on <br />September 25, 2015. <br /> <br />Minor Revision 205 MR-205 updated Exhibit 13C and Map 13C-1 with additional <br />topsoil removal area for the temporary spoil pile to support continued <br />mining operations into 2020. The revision was received on July 1, <br />2019, deemed complete on July 10, 2019 and approved on July 19, <br />2019. <br /> <br />Minor Revision 206 MR-206 updated Exhibit 3 with a new certificate of liability <br />insurance and Exhibit 1B from the Colorado State Land Board <br />allowing Colowyo to upgrade a two-track road on Phase III release <br />reclamation areas to support maintenance of a primary sediment <br />controls structure. The revision was received on August 5, 2019, <br />deemed complete on August 8, 2019 and approved on September 19, <br />2019. <br /> <br />Minor Revision 207 MR-207 updated Map 28 - Topsoil Handling with revised topsoil <br />movements to ensure proper topsoil application volumes can occur in <br />the 2019 reclamation block. The revision was received on September <br />16, 2019, deemed complete on September 24, 2015 and approved on <br />September 26, 2019. <br /> <br />Minor Revision 208 MR-208 incorporated a 0.2 acre increase in the disturbance <br />boundary just north of the Stoker Siding Pond to conduct <br />maintenance activities on the Stoker Siding Pond. The revision was <br />received on September 29, 2019, deemed complete on October 3, <br />2019 and approved on October 8, 2019. <br /> <br />Minor Revision 209 MR-209 incorporated an increase to the disturbance boundary <br />adjacent to the topsoil pile 15H to accommodate removal of the entire <br />topsoil stockpile. The revision was received on October 2, 2019, <br />deemed complete on October 3, 2019 and approved on October 7, <br />2019. <br /> <br />Minor Revision 210 MR-210 incorporated a baseline assessment of several National <br />Register Historic Places, eligible sites, which are located adjacent to <br />mining activities associated with the Collom Pit and Collom Haul <br />Road in 2016. The revision was received on November 22, 2019, <br />deemed complete on December 2, 201p and approved on December <br />9, 2019. <br />Colowyo Mine Midterm Review No. 8 <br />Permit No. C-1981-019 May 5, 2020 <br /> 5 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.