My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-05-06_GENERAL DOCUMENTS - C1981019
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981019
>
2020-05-06_GENERAL DOCUMENTS - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 6:34:53 PM
Creation date
5/12/2020 6:26:44 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
General Documents
Doc Date
5/6/2020
Doc Name
Findings & Cost Estimate
From
DRMS
To
Colowyo Coal Company LP
Type & Sequence
MT7
Permit Index Doc Type
Findings
Email Name
ZTT
JDM
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
823
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Minor Revision 195 MR-195 incorporated geotechnical drill holes on the Collom <br />facilities pad to support final design of the buildings that will be <br />constructed on the Collom facilities pad. The revision was received <br />on January 9, 2019, deemed complete on January 9, 2019 and <br />approved on January 9, 2019. <br /> <br />Minor Revision 196 MR-196 updated requirements for quarterly valley fill inspection <br />reports in the annual reclamation report. The revision was received <br />on January 17, 2019, deemed complete on January 22, 2019 and <br />approved on January 29, 2019. <br /> <br />Minor Revision 197 MR-197 incorporated Exhibit 5 Item 11 which contained the final <br />cultural resources discovery report for the cultural resource sites that <br />were discovered during operations in 2018 for the Collom expansion. <br />The revision was received on January 17, 2019, deemed complete on <br />January 22, 2019 and approved on January 23, 2019. <br /> <br />Minor Revision 198 MR-198 incorporated permit text to describe the construction and <br />maintenance of fencing on BLM lands. The revision was received on <br />January 23, 2019, deemed complete on February 1, 2019 and <br />approved on February 8, 2019. <br /> <br />Minor Revision 199 MR-199 approved the installation of staff gauges in the Section 36, <br />Middle, Section 25, and Section 26 sediment ponds. The revision <br />was received on April 1, 2019, deemed complete on April 8, 2019 <br />and approved on April 10, 2019. <br /> <br />Minor Revision 200 MR-200 incorporated the Gulch A Pond and East Side Collection <br />Ditch remain as permanent structures post-mine. The revision was <br />received on April 1, 2019, deemed complete on April 6, 2019 and <br />approved on April 29, 2019. <br /> <br />Minor Revision 201 MR-201 updated Volume 1, Section 4.12 with documentation of <br />the surface landowner replacing a culvert on the Taylor Creek access <br />road. The revision was received on April 11, 2019, deemed complete <br />on April 19, 2019 and approved on April 29, 2019. <br /> <br />Minor Revision 202 MR-202 updated the cumulative bond schedule presented in <br />Exhibit 13C with clean water diversion CWD-1. The revision was <br />received on May 6, 2019, deemed complete on May 13, 2019 and <br />approved on May 22, 2019. <br /> <br />Minor Revision 203 MR-203 updated the cumulative bond schedule with two <br />additional culverts for the Collom facilities pad, and proposed a <br />potable water well location to support the Collom operation. The <br />Colowyo Mine Midterm Review No. 8 <br />Permit No. C-1981-019 May 5, 2020 <br /> 4 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.