My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-05-06_GENERAL DOCUMENTS - C1981019
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981019
>
2020-05-06_GENERAL DOCUMENTS - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 6:34:53 PM
Creation date
5/12/2020 6:26:44 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
General Documents
Doc Date
5/6/2020
Doc Name
Findings & Cost Estimate
From
DRMS
To
Colowyo Coal Company LP
Type & Sequence
MT7
Permit Index Doc Type
Findings
Email Name
ZTT
JDM
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
823
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Minor Revision 211 MR-211 incorporated documentation of a wildland fire that <br />occurred adjacent to the Collom Haul Road on October 26, 2019. <br />The revision was received on November 22, 2019, deemed complete <br />on December 2, 2019 and approved on December 10, 2019. <br /> <br />Minor Revision 212 MR-212 incorporated a small crew trailer near the Collom <br />substation to support mining operations at the Collom Pit. The <br />revision was received on November 25, 2019, deemed complete on <br />December 4, 2019 and approved on December 11, 2019. <br /> <br />Minor Revision 213 MR-213 was withdrawn. <br /> <br />Minor Revision 214 MR-214 updated Exhibit 13C - Cumulative Bond Schedule with <br />information pertaining to the planned dewatering wells for the <br />Collom Pit. The revision was received on January 13, 2020, deemed <br />complete on January 17, 2020 and approved on January 20, 2020. <br /> <br />Minor Revision 215 MR-215 updated Exhibit 13C - Cumulative Bond Schedule with <br />information pertaining to the planned dewatering wells for the <br />Collom Pit. The revision was received on January 18, 2020, deemed <br />complete on January 25, 2020 and approved on March 3, 2020. <br /> <br />Technical Revision 121 TR-121 incorporated a power distribution system to support <br />mining operations in the Collom Pit including light-use roads to <br />facilitate and access to construct and maintain the power line. The <br />revision was received on June 21, 2018, deemed complete on June <br />28, 2018 and approved on August 28, 2018. <br /> <br />Technical Revision 122 TR-122 incorporated an Upper and Lower Ditch near the toe of <br />the fill on Haul Road A. The revision was received on June 27, 2018, <br />deemed complete on July 3, 2018 and approved on September 18, <br />2018. <br /> <br />Technical Revision 123 TR-123 incorporated using the Collom Aspen reference area <br />instead of the Danforth Hills reference area to evaluate revegetation <br />success for the South Taylor reclamation units. The revision was <br />received on July 26, 2018, deemed complete on August 3, 2018 and <br />approved on October 9, 2018. <br /> <br /> <br />Technical Revision 124 TR-124 incorporated a revised footprint for the temporary spoil <br />pile at the Collom Pit to allow overburden materials to be placed <br />closer to the northern limit of the Collom Pit. The revision was <br />received on July 31, 2018, deemed complete on August 10, 2018 and <br />approved on October 23, 2018. <br />Colowyo Mine Midterm Review No. 8 <br />Permit No. C-1981-019 May 5, 2020 <br /> 6 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.