My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-05-06_GENERAL DOCUMENTS - C1981019
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981019
>
2020-05-06_GENERAL DOCUMENTS - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 6:34:53 PM
Creation date
5/12/2020 6:26:44 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
General Documents
Doc Date
5/6/2020
Doc Name
Findings & Cost Estimate
From
DRMS
To
Colowyo Coal Company LP
Type & Sequence
MT7
Permit Index Doc Type
Findings
Email Name
ZTT
JDM
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
823
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />HOURLY PRODUCTION <br /> <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br /> Material weight: 2,550 Pounds/LCY <br /> Description: Earth - Dry packed <br /> Rated Payload: 492,200 Pounds <br />Payload Capacity: 193.02 LCY <br /> <br /> <br />Truck Bed (volume) Basis: <br /> Struck Volume: 153.00 LCY <br /> Heaped Volume: 192.00 LCY <br /> Average Volume: 172.50 LCY <br />Adjusted Volume: 192.00 LCY <br /> <br /> <br /> <br />Final Truck Volume Based on Number of Loader Passes: LCY <br />174.90 <br /> <br />Loading Tool Capacity <br /> <br />Bucket Size Class: NA <br /> <br />Rated Capacity: 53.000 LCY (heaped) <br />Bucket Fill Factor: 1.100 Other - rock/dirt mixtures (100-120%) 1.100 <br />Adjusted Capacity: LCY <br />58.300 <br /> <br />Job Condition Corrections: Site Altitude (ft.): 7600 feet <br /> <br /> Truck Loader Source <br />Altitude Adj: 1.000 0.980 (CAT HB) <br />Job Efficiency: 0.830 0.830 (CAT HB) <br /> <br />Net Correction: <br />0.830 0.813 <br /> <br /> Loading Tool Cycle Time: <br />Number of Loading Tool Passes Required to Fill passes <br />3 <br /> <br />Truck: <br /> Excavators and Front Shovels: <br /> <br /> <br />Machine Cycle Time vs. Job Condition Rating: NA <br /> <br /> <br />Selected Value within this Basic Rating: NA <br /> <br />Track Loaders Material Description: <br /> <br />Cycle Time Elements (min.): <br /> <br />Load: NA Maneuver: NA Dump: 0.100 <br /> <br />Wheel and Track Loaders - Unadjusted Basic Loader Cycle Time (load, dump, minutes <br />0.725 <br />maneuver): <br /> <br />Cycle Time Factors Factor (min.) Source <br />Material: 0.030 (Cat HB) <br />Stockpile: Conveyor or dozer piled 10 ft. high and up <br />0.000 (Cat HB) <br />0.00 <br />Truck Ownership: Common ownership of trucks and loaders - <br />-0.040 (Cat HB) <br />0.04 <br />Operation: Constant operation -0.04 -0.040 (Cat HB) <br />Dump Target: Nominal target 0.00 0.000 (Cat HB) <br /> Net Cycle Time Adjustment: -0.050 minutes <br /> Adjusted Loader Cycle Time: minutes <br />0.675 <br /> Net Load Time per Truck: minutes <br />1.450 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.