Laserfiche WebLink
TRUCK/LOADER TEAM WORK <br /> <br />Task description: <br />Load/Haul/Regrade Topsoil to Collom Facility from TS 25A <br /> <br />Site: Permit Action: 13C (MT8) Permit/Job#: C1981019 <br />Colowyo Coal Mine <br /> <br />PROJECT IDENTIFICATION <br /> <br />Task #: 016 State: Colorado Abbreviation: None <br />Date: 4/18/2020 County: Moffat Filename: C019-016 <br />User: ZTT <br /> <br /> <br />DRMS <br />Agency or organization name: <br /> <br />HOURLY EQUIPMENT COST Shift basis: 1 per day <br /> <br /> Equipment Description <br />Truck Loader Team -Truck: KOMATSU 830E <br />-Loader: LETOURNEAU L2350 <br />Support Equipment -Load Area: Cat D11T - 11U <br />-Dump Area: Cat D11T - 11U <br />Road Maintenance Motor Grader: CAT 16M <br />-Water Truck: Water Tanker, 14,000 Gal. <br /> <br />Cost Breakdown: Truck/Loader Team Support Equipment Maintenance Equipment <br />Water Truck <br />Truck Loader Load Area Dump Area Motor <br /> <br />Grader <br />%Utilization-machine: 100 100 100 100 50 50 <br />Ownership cost/hour: $193.78 $407.68 $268.07 $268.07 $82.71 $84.51 <br />Operating cost/hour: $213.02 $421.97 $222.10 $222.10 $35.04 $63.80 <br />%Utilization-riper: NA 0 NA NA NA NA <br />Ripper own. <br />NA $0.00 $0.00 $0.00 $0.00 $0.00 <br />cost/hour: <br />Ripper op. cost/hour: NA $0.00 $0.00 $0.00 $0.00 $0.00 <br />Operator cost/hour: $34.38 $40.65 $41.24 $41.24 $28.52 $21.09 <br />Unit Subtotals: $441.17 $870.30 $531.41 $531.41 $146.27 $169.40 <br />Number of Units: 4 1 1 2 1 1 <br />Group Subtotals: Work: $2,634.98 Support: $1,594.23 Maint: $315.67 <br /> <br />Total work team cost/hour: $4,544.88 <br /> <br />MATERIAL QUANTITIES <br /> <br />Initial volume: 327,278 CCY Swell factor: 1.125 <br />Loose volume: LCY <br />368,188 <br /> <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br /> <br />