Laserfiche WebLink
Truck Cycle Time: <br /> <br />Truck Exchange Time: 0.80 Minutes Adjusted for site altitude: 0.800 Minutes <br />Truck Load Time: 1.450 Minutes Adjusted for site altitude: 1.480 Minutes <br />Truck Maneuver and Dump 1.20 Minutes Adjusted for site altitude: 1.200 Minutes <br />Time: <br /> <br /> <br />Truck Travel (Haul & Return) Time: Road Condition: Hard, smooth, stabilized, surfaced, watered, <br />maintained 2.0 <br />Haul Route: <br />Travel <br />Seg # Haul Distance Grade (%) Roll. Res Total Res Velocity <br />Time <br />(Ft) (%) (%) (fpm) <br />(min) <br />1 6500.00 5.00 2.00 7.00 1160 5.791 <br /> <br />Haul Time: minutes <br />5.791 <br />Return Route: <br />Travel <br />Seg # Haul Distance Grade (%) Roll. Res Total Res Velocity <br />Time <br />(Ft) (%) (%) (fpm) <br />(min) <br />1 6500.00 -5.00 2.00 -3.00 3503 1.913 <br /> <br />Return Time: minutes <br />1.913 <br />Total Truck Cycle Time: minutes <br />11.184 <br /> <br />Loading Tool unit <br />Production 4,603.46 LCY/Hour Adjusted for job efficiency: 3,820.87 LCY/Hour <br />Truck Unit Production <br />938.34 LCY/Hour Adjusted for job efficiency: 778.82 LCY/Hour <br /> <br />Optimal No. of Trucks: 5 Truck(s) Selected Number of Trucks: 4 Truck(s) <br /> <br />Adjusted hourly truck team production: 3,115.29 LCY/Hour <br />Adjusted single truck/loader team production: 3,115.29 LCY/Hour <br />Adjusted multiple truck/loader team production: LCY/Hour <br />3,115.29 <br /> <br />JOB TIME AND COST <br /> <br />Fleet size: 1 Team(s) Total job time: Hours <br />118.19 <br /> <br /> <br />Unit cost: $1.459 /LCY Total job cost: <br />$537,148 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />