My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-05-08_PERMIT FILE - M2020007
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2020007
>
2020-05-08_PERMIT FILE - M2020007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2025 6:18:40 AM
Creation date
5/12/2020 6:35:47 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2020007
IBM Index Class Name
PERMIT FILE
Doc Date
5/8/2020
Doc Name
Adequacy Review Response
From
Environment, Inc.
To
DRMS
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
166
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT L RECLAMATION COSTS(CONT) <br /> according to our records . Total dewatering time includes 36 . 6 <br /> days to pump the lake, 5 . 8 days to build slopes and 0 . 35 days to <br /> pump recharge . The total pumping time is rounded to 43 . 0 days . <br /> The settling ponds areas can be filled to a level 2 foot over the <br /> ground water table, so no dewatering cost is included for Phases <br /> lA and 2A. Phase 1 sloping below the water line is complete . <br /> The equipment used in the estimate is. <br /> Scraper teams - 2-Cat 627G scraper, D9R Dozer, 140H grader & <br /> water truck - Resoiling & backfilling <br /> Grader - Cat 140H - seedbed prep and ripping plant site <br /> Dozers - 2 - Cat D9R - cut/fill working face sloping <br /> Dewatering Pump data 3-600M (6000 gpm each) , 1511 , 121'suction & <br /> discharge hoses - total (18 , 000gpm) <br /> Seeding team - standard farm tractor and pull behind drill , and <br /> crimping disk attachment <br /> L.G. Everist,Inc. Ragsdale Reservoirs May 5,2020 <br /> 82 <br />
The URL can be used to link to this page
Your browser does not support the video tag.