Laserfiche WebLink
EXHIBIT L RECLAMATION COSTS(CONT) <br /> Cost Breakdown <br /> Task Description Direct Cost <br /> 001 - Revegetation -94 . 00 acres @ $850 . 00/ac $79 , 900 . 00 <br /> 002 - Replace Topsoil - 106 . 10 ac 101deep $131, 656 . 78 <br /> *1 . 12 @ <br /> 82 .4G/yd <br /> 003 - Rip Plant site, drying pad and bone yard $5, 879 . 09 <br /> 59 . 32 ac @ $99 . 11/ac <br /> 004 - Grade and shape 109 . 10 @ $93 . 71/ac . $10 , 224 . 19 <br /> 005 - Bond Construct slurry wall liner till $1, 067, 475 . 00 <br /> certified Phase 2 <br /> (8275 lft) at 43 ft deep @ $3 . 00 sq-ft . <br /> 006 - Grade working face slope 2600 lft * $10, 771 . 95 <br /> 5 . 65 cy/lft @ 63 . 7�/yd <br /> 007 - Partially Backfill Phases lA & 2A - $494 , 445 . 22 <br /> 600, 000 cu-yd @ 82 . 4�/yd <br /> 008- Mob/demob $6 , 406 .48 <br /> 010 - Dewatering proposed Reservoir in Phase 2 $15 , 093 . 00 <br /> 115 . 40 ac - 43 days @ $351 . 00/day (3 <br /> pumps) <br /> 010 - Concrete demo from Plant 200 yds @ $1, 400 . 00 <br /> $7 . 00/yd <br /> 011 - Weed Control per year $5, 000 . 00 <br /> 012 - Secondary seeding 102 . 03 ac * 25% @ $4, 993 . 75 <br /> $212 . 50/ac <br /> Total Direct costs $1, 833 , 245 . 46 <br /> INDIRECT COSTS <br /> Liability insurance @ 2 . 02% $37 , 031 . 56 <br /> Performance bond @ 1 . 05% $19, 249 . 08 <br /> Profit @ 10% $183 , 324 . 55 <br /> Total Indirect costs $239, 605 . 19 <br /> ENGINEERING AND MANAGEMENT <br /> Reclamation Management @ 5% $103 . 642 . 53 <br /> En ineerin @ 6% $124 , 371 . 04 <br /> Total bond $2, 30`0, 864 .22 ' <br /> RECOMMEND BOND BE SET AT $2,300,900.00 <br /> L.G. Everist, Inc. Ragsdale Reservoirs May 5,2020 <br /> 83 <br />