Laserfiche WebLink
The product from this mine will positively impact this community by supplying construction <br /> materials to the Highway 17 Road project. <br /> 7. Surface Water Control <br /> The entire operation will drain internally. The topsoil berm along the uphill sides of the site will <br /> prevent off-site drainage from reaching the disturbed ground. The disturbed area will all be <br /> graded to drain internally. The topsoil berm will be a minimum of two feet tall. The stripping of <br /> topsoil will create a deep enough depression(-14 inches)to contain the 2.0 inch 100-YR 24-HR <br /> storm event for the region. There will be no discharge of any kind from the site. <br /> Hooper Pit C-4 <br /> April 2020 X (:reg l.ewicki and Associates,PI IA <br />