My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-04-28_PERMIT FILE - M2020024
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2020024
>
2020-04-28_PERMIT FILE - M2020024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2020 7:24:34 AM
Creation date
4/29/2020 4:03:06 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2020024
IBM Index Class Name
PERMIT FILE
Doc Date
4/28/2020
Doc Name
Application
From
APC Southern Construction Co. LLC
To
DRMS
Email Name
ECS
MAC
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECLAMATION PLAN EXHIBIT D <br /> 1. General Reclamation Plan <br /> The total permit area is 9.5 acres. The amount of land that will be disturbed is 7.4 acres. <br /> Operations will disturb 5 acres of currently undisturbed land in the permit area. Reclamation will <br /> be conducted over all of the mining area at once at the end of mining. All disturbed areas will be <br /> reclaimed as rangeland. See Map E-3 for details. <br /> 2. Topsoil Replacement <br /> The topsoil thickness is expected to range from 0-28 inches. An average of 14 inches of topsoil <br /> will be stripped. During mining,the topsoil will be stored in a berm uphill of the site and in the <br /> topsoil storage area. See Map E-2. Soil will be replaced over the entire mine site at once, due to <br /> the small size of the site. Topsoil thickness upon replacement is expected to be 14 inches on <br /> average.All topsoil will be scarified to a depth of six inches by disc or plow. <br /> 3. Haul Roads and Access <br /> One access road will connect the CR 62 to the pit. See Map E-3 for the layout of roads after <br /> mining and reclamation. <br /> 4. Reclamation Timetable <br /> See Exhibit E section 2. <br /> Hooper Pit D-1 <br /> April 2020 ..)K Greg Lewicki and Arurciatcw,PI IA <br />
The URL can be used to link to this page
Your browser does not support the video tag.