2. Mining Timetable <br /> Due to the small scale of this operation,the Hooper Pit mining timetable is short and succinct: <br /> Table C-1 —Mining Timetable <br /> Date Activity <br /> Summer 2020 Strip mining area, construct berms using stripped topsoil <br /> Summer 2020 Produce material for Highway 17 job <br /> Fall 2020 Complete reclamation <br /> Note:Times frames discussed here are approximate and determined by the needs of the construction contract. <br /> 3. Mine Facilities and Operation <br /> No plants or fuel storage will be onsite.No processing will take place onsite.No permanent <br /> structures will be built within the permit area, as part of this operation. Water is used to control <br /> dust on the excavation areas. Water for this operation will be trucked to the site from an offsite <br /> source. It is estimated that the operation will consume 500 gallons per day in dust suppression. <br /> No maintenance of equipment of any kind will take place on site. <br /> The following list is the best estimate of the required equipment to be used onsite throughout the <br /> mine life: <br /> 3_1 Pit Equipment <br /> • Front End Loader <br /> • Dozer <br /> Support equipment will come to the site on an as-needed basis. <br /> There is no blasting as part of this operation. <br /> No acid or toxic producing materials are expected to be encountered in this operation. If these <br /> materials are encountered,topsoil will be placed over the area and mining will move to a <br /> different area. <br /> Hooper Pit C-2 <br /> April 2020 (.reg Lewicki and As%od des,I' l,(' <br />