Environment, Inc. Page 3 <br /> The Walsenburg Sand and Gravel Company Sand Arroyo Pit <br /> Adequacy Response 01 March 6, 2020 <br /> 7 . Please clarify if water will be used during mining and processing <br /> material at the site. Statements made in sections h) , j ) , and m) <br /> need additional clarification. <br /> These sections have been revised to address how water and processing are utilized at <br /> the mine. A copy of the revised EXHIBIT D-MINING PLAN is provided. <br /> It has come to our attention that this mine is not approved for intermittent <br /> operations. This was an oversight, and was left out of the previous permit <br /> amendments. The Walsenburg Sand and Gravel Company would like to have this mine <br /> approved for intermittent operations as it better describes how the mine operates <br /> under normal conditions. Text to address this has been added to page 11 in the <br /> ADDITIONAL INFORMATION section. A complete EXHIBIT D - MINING PLAN section is <br /> provided since we also addressed the water questions in section (h),( j), and (m) <br /> EXHIBIT E - Reclamation Plan (Rule 6.4.5) : <br /> 8 . Please describe what the batch plant has to do to clean up the <br /> truck washout area and equipment parking/storage area. <br /> The landowners have a lease with Custer County Concrete that requires them to <br /> clean-up the areas when the lease ends. We suspect they would remove their <br /> equipment and supplies, and grade the level areas. There are no reserves of soil for <br /> use to revegetate the areas, since these areas have been disturbed for many years. <br /> In the largest area where they excavated into the hill, they left steep slopes so we do <br /> not know how they are required to fix them. In the concrete washout area they will <br /> have to come up with a method to removed or fracture the concrete and cover it for <br /> revegetation. <br /> 9 . The Division understands that there are currently areas that have <br /> been impacted and are the responsibility of others . However, <br /> these areas are within the proposed amendment boundary so the <br /> Division will need a commitment from the Operator that in the <br /> event the areas are not reclaimed by the concrete batch plant the <br /> Operator will reclaim the areas to rangeland. <br />