Laserfiche WebLink
MINING PLAN (CONT) EXHIBIT D <br /> September 2019 <br /> (o) As stated above there are no incidental products to be <br /> involved in the mining/extraction by this operation. <br /> (p) This is strictly a sand operation with the mining done by <br /> front end loader or bull dozers . The same equipment will be <br /> used to remove the upland materials . No explosives are use at <br /> the mine . <br /> ADDITIONAL INFORMATION <br /> Approximately 30 . 5 Acres in the mine may never be mined, <br /> either because there is no material suitable for WSG' s needs or <br /> it contains material that has a limited demand. There is a <br /> limited amount north of the access road that leads to the Con- <br /> crete Batch Plant area that may be mined. Map Exhibit C-1 - Mining Plan Map <br /> shows the current proposed mining areas and the most recent <br /> disturbed areas where mining was done . We expect to continue <br /> mining the dry creek bed as long as it keeps filling when <br /> flooded. <br /> This pit will be operated year-around by The Walsenburg Sand <br /> and Gravel Company weather permitting. There may be periods when <br /> the demands for material are slow and no mining will take place <br /> at which time the mine will become an Intermediate Operation . <br /> Stockpiles of material will be maintained on the site and as the <br /> need arises, it will be hauled to our project sites or sold to <br /> the public . <br /> MINING TIMETABLE <br /> This estimated mining timetable is based on an average year <br /> and WSG expects a specific year to vary widely from the average . <br /> On the upland areas there is a finite amount of material that <br /> once removed will not be replenished. On the sand arroyo, <br /> whenever it floods, it replenishes the mined areas with new sand. <br /> Mining will only end if the area is not refilled or the mine is <br /> closed. If there are changes in the mining timetable we will <br /> discuss the reasons for the change in the annual report following <br /> the change and modify it at that time . <br /> ESTIMATED MINING TIMETABLE <br /> ACRES ± <br /> Area ESTIMATED TOTAL TOTAL <br /> YEARS AREA MINED <br /> Sand Channel unknown 26 . 6 26 . 00 <br /> Upland Areas 8-15 41 . 05 15 . 00 <br /> TOTALS I unknown 1 67 . 651 41 . 00 <br />