My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-03-06_REVISION - M1978283
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1978283
>
2020-03-06_REVISION - M1978283
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 5:59:48 PM
Creation date
3/9/2020 12:00:42 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978283
IBM Index Class Name
REVISION
Doc Date
3/6/2020
Doc Name
Adequacy Review Response
From
Environment, Inc.
To
DRMS
Type & Sequence
AM1
Email Name
JPL
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINING PLAN (CONT) EXHIBIT D <br /> September 2019 <br /> (o) As stated above there are no incidental products to be <br /> involved in the mining/extraction by this operation. <br /> (p) This is strictly a sand operation with the mining done by <br /> front end loader or bull dozers . The same equipment will be <br /> used to remove the upland materials . No explosives are use at <br /> the mine . <br /> ADDITIONAL INFORMATION <br /> Approximately 30 . 5 Acres in the mine may never be mined, <br /> either because there is no material suitable for WSG' s needs or <br /> it contains material that has a limited demand. There is a <br /> limited amount north of the access road that leads to the Con- <br /> crete Batch Plant area that may be mined. Map Exhibit C-1 - Mining Plan Map <br /> shows the current proposed mining areas and the most recent <br /> disturbed areas where mining was done . We expect to continue <br /> mining the dry creek bed as long as it keeps filling when <br /> flooded. <br /> This pit will be operated year-around by The Walsenburg Sand <br /> and Gravel Company weather permitting. There may be periods when <br /> the demands for material are slow and no mining will take place <br /> at which time the mine will become an Intermediate Operation . <br /> Stockpiles of material will be maintained on the site and as the <br /> need arises, it will be hauled to our project sites or sold to <br /> the public . <br /> MINING TIMETABLE <br /> This estimated mining timetable is based on an average year <br /> and WSG expects a specific year to vary widely from the average . <br /> On the upland areas there is a finite amount of material that <br /> once removed will not be replenished. On the sand arroyo, <br /> whenever it floods, it replenishes the mined areas with new sand. <br /> Mining will only end if the area is not refilled or the mine is <br /> closed. If there are changes in the mining timetable we will <br /> discuss the reasons for the change in the annual report following <br /> the change and modify it at that time . <br /> ESTIMATED MINING TIMETABLE <br /> ACRES ± <br /> Area ESTIMATED TOTAL TOTAL <br /> YEARS AREA MINED <br /> Sand Channel unknown 26 . 6 26 . 00 <br /> Upland Areas 8-15 41 . 05 15 . 00 <br /> TOTALS I unknown 1 67 . 651 41 . 00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.