Laserfiche WebLink
contemporaneous reclamation process. Excess overburden will be placed on the pit floor, as needed <br />to make a volume balance. <br />2. Mining Timetable <br />The following table (Table D-3,) is a best estimate of the sequence of operations for the life of the <br />mine and is based on producing 225,000 raw tons per year. The estimate life of this mine is 10 <br />years. Two years will likely be needed to achieve reclamation success. <br />Table D-3: Pit 1 Mining Timetable <br />Year <br />1 <br />Gravel <br />----' (thousand tons) <br />Gravel <br />(thousand tons) <br />Gravel <br />(thousand tons) <br />-- --- <br />2 -- <br />--- 225 ------ <br />3 <br />225 <br />4 <br />225 <br />5 <br />225 <br />6 <br />225 <br />7 <br />33 — <br />197 <br />8 <br />225 <br />9 <br />136 <br />89 <br />10 <br />225 <br />Total <br />1,158 <br />558 <br />321 <br />Rincon Materials D-4 Greg Lewkki and Amciakw PLLC <br />February 2020 <br />