CffK CONTINENTAL MATERIALS CORPORATION <br /> b. Describe moisture conditioning methods to achieve the compaction specification, <br /> Response: The text in Exhibit D specifies that moisture conditioning will be performed to achieve the <br /> compaction requirements.As is standard on most construction sites, a water truck will be used to <br /> increase the moisture content of the fill as it is placed and compacted. The amount of water added will <br /> depend on recent precipitation, wind, and other variables, and the compaction monitoring will be used <br /> to demonstrate that the required compaction and density was achieved. <br /> c. Provide a minimum density testing frequency(i.e., number of tests per unit volume of placed <br /> material), <br /> Response: The text in Exhibit D has been revised to address this comment. CIVIC proposes to test <br /> density at least every 5,000 cubic yards, which is at the rate of approximately two tests per day.Tests <br /> that fail the 90% proctor specification will receive additional moisture conditioning and compaction until <br /> the density meets the project goals.The compaction method will be demonstrated at the start of the <br /> project to verify that the "method specification" meets the project goals. <br /> d. Describe the screening for deleterious/putrescible material and the fate of unacceptable material(s), <br /> Response: The text in Exhibit D has been revised to address this comment.Also, see the responses to <br /> Comment 9g, below. <br /> e. Describe how complying with these specifications and backfill slopes will be demonstrated to the <br /> DRMS, <br /> Response: The text in Exhibit D has been revised to address this comment.The compaction records will <br /> be maintained onsite and will be available for DRMS inspection. CIVIC will include the construction <br /> testing results in the monthly monitoring summary;this summary will include construction quality <br /> assurance test results, geotechnical monitoring results, construction volumes, and drone survey results. <br /> f. Clarify how the granite material described as "Bulldozers will push excavated material downhill to the <br /> reclamation slope configuration..." (reference page D-2, paragraph (b), Earthmoving Operations) in the <br /> upper slope will meet the compaction specifications. <br /> Response: The text in Exhibit D has been revised to address this comment. Granite will be pushed by <br /> dozer to move the bulk fill.A second dozer push will distribute the granite parallel to the quarry face in <br /> an appropriate lift thickness.The fill will be watered and compacted to complete the placement in a <br /> level fashion that is cross hill and horizontal. <br /> g. Discuss how the area backfilled to date (Area H)was compacted to assist in stabilizing the slide area <br /> and meet the specifications. <br /> Pikeview Quarry Amendment 4, Response to Adequacy <br /> February 7,2020 <br /> 3 <br />