Laserfiche WebLink
• Types of Explosives Used <br /> • Storage of Explosives <br /> • Dates and Times of Blasting <br /> • Transportation of Explosives <br /> • Loading of Explosives <br /> • Signage <br /> • Communications <br /> • Blast Area Clearing and Firing Procedures <br /> • Post Blast Inspection Procedures <br /> • Misfire Procedures <br /> • Blast Monitoring Procedures <br /> Please see details regarding blasting in Exhibit D - Mining Plan and the full preliminary <br /> blast plan included in Appendix 3. <br /> 10. Prior to the rail spur construction the Applicant will have to submit a Technical <br /> Revision for the Division's approval. <br /> The Applicant acknowledges the Division requirement of submitting a TR regarding rail <br /> spur designs prior to rail spur construction and commits to submitting said TR at the <br /> required time. <br /> H. Please include a statement that the deeper depressions from the boulder pick up <br /> operations will be graded to minimize any potential hazard to wildlife. <br /> The potential for the boulder pick up operation has been removed from the I I2c permit file and <br /> will no longer be pursued or planned. If any changes to include boulder pick up are pursued in <br /> the future, a TR will be submitted to the Division detailing that intent. <br /> 12. Please provide a statement that the inert structural fill imported to the site will meet all <br /> the requirements of*Rule 3.1.5(9) and in accordance with Rule 3.1.5(9)(c)please submit <br /> an affidavit, signed by the Applicant now, ensuring that any materials imported to the site <br /> for backfilling will be clean and inert. <br /> Please see the signed affidavit from the Bradford Mesa Quarry certifying that all imported <br /> materials to be used during reclamation are clean and inert included in Exhibit E: Reclamation <br /> Plan. A blank affidavit to be signed by each Contractor every time an import is made to the <br /> Bradford Mesa Quarry remains in the 112c permit file to be completed and retained on site. <br /> 13. The Mining Plan proposes to import concrete rubble to be placed in the mined out <br /> sections for backfill material. Please describe how rebar within the rubble will be <br /> handled. <br /> All exposed rebar will be either removed from the concrete it's held within or will be buried by <br /> at least 3 feet of acceptable fill material. This details is included on page E-4. <br /> Bradford Mesa—Preliminary Adequacy Response 4 <br />