My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-12-13_REVISION - M1980244 (63)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2019-12-13_REVISION - M1980244 (63)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2025 2:40:00 AM
Creation date
12/17/2019 8:37:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
12/13/2019
Doc Name Note
Appendix 11
Doc Name
Request For Amendment To Permit
From
CC&V
To
DRMS
Type & Sequence
AM13
Email Name
TC1
MAC
BFB
ERR
JPL
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CCd,V TANK YISUAE iNSPECTIDN AH'd tNTEGRfTY TESTING(Pane 2 of 21 <br /> Tank No, Tank 1 Container Volume Contents of Tank or <br /> or Container Material Tank Units Container Visual Inspection Integrity Testing' Location or Comment <br /> Tanks and Containers at the Midway Fuel Farm <br /> MWFF-(1-6) Cyl.Single Wall Steel Tanks 30,000 gal Off-road Diesel Fuel Monthly Since these tanks were Midway Fuel Farm <br /> Mounted Horizontally(6 tanks) all newly constructed in <br /> MWFF-7 Cyl.Double Wall Steel Tank 12,000 gal Gasoline Monthly 2012 and the Steel Tank <br /> Mounted Horizontally institute Fireguard Documents <br /> MWFF-8 Cyl_Double Wall Steel Tank 1,000 gal DFO#1 (Kerosene) Monthly and the Underwriters Lab <br /> Mounted Horizontally Documents were provided <br /> MWFF-9 Cyl.Double Wail Steel Tonic 1,000 gal DFO#2(Light Vehicle Diesel) Monthly by Eaton Tank,no father <br /> Mounted Horizontally integrity testing will be <br /> MWFF-10 Cyl.Double Wall Steel Tank 1,000 gal Diesel Additive(anti-gel) Monthly required until 2025. <br /> Mounted Horizontally <br /> MWFF-11812 Rectangular Steel Single 750 gal Antifreeze Monthly Since these tanks were <br /> Wall Tanks(2) all newly constructed in <br /> MWFF-13&14 Rectangular Steel Single 750 gal 10 Wt Oil(Hydraulic) Monthly 2012 and the Steel Tank <br /> Wall Tanks(2) Institute Fireguard Documents <br /> MWFF-15&16 Rectangular Steel Single 750 gal 30 Wt Oil Monthly and the Underwriters Lab <br /> Wall Tanks(2) Documents were provided <br /> MWFF-17818 Rectangular Steel Single 750 gal 15W40 Oil Monthly by Eaton Tank,no further <br /> Wall Tanks(2) integrity testing will be <br /> MWFF-19 Rectangular Steel Single 4,000 gal Oily Water Monthly required until 2025. <br /> Wall Tank for Oil Water Separator <br /> Adsomtion Desomdon Recovery Plant Generators <br /> ADRG-1 Steel Rectangular Belly Tanks 12,000 gal Diesel Fuel Monthly It is impractical to test these tanks due to the location of the generator units <br /> Generator Units(4 C 3,000) and the fact they rest directly on the ground. The visual inspections <br /> ADRG-2 Sheet Rectangular Belly Tank 1,200 gal Diesel Fuel Monthly combined with adequate containment provide"equivalent environmental <br /> Generator Units(1 C 1,200) protecction"in the opinion of the certifying engineer. <br /> 140 CFR Part 112.7(d)requires that for bulk storage containers,periodic integrity testing of containers and leak testing of valves and piping must be conducted_ Steel Tank Institute SP001-03 <br /> Inspection of Shop Fabricated ASTs will serve as the reference method for testing. American Petroleum Institute 653 may also be used for tanks and API Standard 570 maybe used for piping. <br /> Appropriate integrity testing may be done by a CC&V employee providing the employee has received training by the company that manufactures the device used to conduct the testing. For example, <br /> if the CCBV employee uses a model"25DL plus"by Olympus to conduct ultrasonic tests,then he/she must verify in wetting that he/she has completed a training course by Olympus or has <br /> been instructed by a competent instructor in the proper use of the equipment. This written record of training must be kept with the current SPCC plan_ Previous training and experience can <br /> suffice if the employee documents use of the equipment and signs a statement that he/she is compoetent in the use of the device in question. This record must be kept with the current SPCC plan. <br /> It is the opinion of the certifying engineer that this procedure of allowing a qualified CCBV employee to conduct the testing is"equivalent environmental protection"under the SPCC regulations at <br /> 40 CFR Part 112_ <br /> Document Name_ Spill Response Plan-Tank Inspection July 2015 <br /> Document Control No. H&S 023-5 Printed Copies are Uncontrolled <br />
The URL can be used to link to this page
Your browser does not support the video tag.