Laserfiche WebLink
CC&V TANK VISUAL INSPECTION AND INTEGRITY TESTING fPaae 1 of 21 <br /> Tank No_ Tank 1 Container Volume Contents of Tank or <br /> or Container Material Tank Units Container Visual Inspection Integrity Testing' Location or Comment <br /> Tanks and Containers INSIDE the Ironclad Facility <br /> OTS-1 Cylindrical Steel Tank 658 gal Rock Drill Oil Monthly Ironclad Facility-Old Truck Shop Oil Room <br /> OTS-2 Cylindrical Steel Tank 658 gal Rods Drill Oil Monthly Ironclad Facility-Old Truck Shop Oil Room <br /> OTS-3 Cylindrical Steel Tank 1,248 gal HD Transmission Oil Monthly These Tanks were tested Ironclad Facility-Old Truck Shop Oil Room <br /> OTS-4 Cylindrical Steel Tank 1,248 gal AnfifreezeiEthylene Glycol Monthly by Acuren in June 2011_ Ironclad Facility-Old Truck Shop Oil Room <br /> OTS-5 Cylindrical Steel Tank 4,888 gal Hydraulic Oil Monthly They will be re-bested in Ironclad Facility-Old Truck Shop Oil Room <br /> OTS-0 Cylindrical Steel Tank 4,888 gal 15W-40 Oil Monthly 2D1612017 if still in service Ironclad Facility-Old Truck Shop Oil Room <br /> OTS-7 Cylindrical Steel Tank 11,844 gal Used Oil Monthly Ironclad Facility-Old Truck Shop Oil Room <br /> OTS-9 Cylindrical Steel Tank 658 gal Drive Train 30W Oil Monthly Ironclad Facility-Old Truck Shop Oil Room <br /> OTS-10 Cylindrical Steel Tank 658 gal E_P_80W-90 Oil Monthly Ironclad Facility-Old Truck Shop Oil Room <br /> Tanks and Containers INSIDE the New Truck Shop <br /> NTS-1 Steel Cylindrical Tank 12,000 gal Used Oil Monthly New Truck Shop Oil Room <br /> NTS-2 Steel Cylindrical Tank 6,000 gal 30 Wt Transmission Fluid Monthly These Tanks were tested New Truck Shop Oil Room <br /> NTS-3 Steel Cylindrical Tank 6,000 gal Final Drive Oil Monthly by Acuren in June 2011_ New Truck Shop Oil Room <br /> NTS-4 Steel Cylindrical Tank 6,000 gal XL 400 Motor Oil 15W40 Monthly They will be re-tested in New Truck Shop Oil Room <br /> NTS-5 Steel Cylindrical Tank 6,000 gal HD Trans 10 Oil Monthly 2016 12017 if still in service New Truck Shop Oil Room <br /> NTS-6 Steel Cylindrical Tank 3,000 gal Antifreeze Premix Monthly New Truck Shop Oil Room <br /> r40 CFR Part 112.7(d)requires that for bulk storage containers,periodic integrity besting of containers and leak testing of valves and piping must be conducted. Steel Tank Institute SP001-03 <br /> Inspection of Shop Fabricated ASTs will serve as the reference method for testing. American Petrolem Institute 653 may also be used for tanks and API Standard 570 maybe used for piping. <br /> Appropriate integrity testing may be done by a CCTV employee providing the employee has received training by the company that manufactures the device used to conduct the testing. For example, <br /> if the CCBV employee uses a model"25DL pkrs'by Olympus to conduct ultrasonic tests,then he/she must verify in writing that he/she has completed a training course by Olympus or has <br /> been itstructed by a competent instructor in the proper use of the equipment This written record of training must be kept with the current SPCC plan_ Previous training and experience can <br /> suffice if the employee documents use of the equipment and signs a statement that he/she is competent in the use of the device in question. This record must be kept with the current SPCC plan. <br /> It is the opinion of the certifying engineer that this procedure of allowing a qualified CCSV employee to conduct the testing is"equivalent environmental protection"under the SPCC regulations at <br /> 40 CFR Part 112. <br /> Document Name: Spill Response Plan-Tank Inspection July 2015 <br /> Document Control No. H&S 023-5 Printed Copies are Uncontrolled <br />