My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-12-13_REVISION - M1980244 (60)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2019-12-13_REVISION - M1980244 (60)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2025 2:33:04 AM
Creation date
12/17/2019 8:34:53 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
12/13/2019
Doc Name Note
Appendix 10 - 11
Doc Name
Request For Amendment To Permit
From
CC&V
To
DRMS
Type & Sequence
AM13
Email Name
TC1
MAC
BFB
ERR
JPL
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Spill . . <br /> NORTHNEWMONT Countermeasures Plan for the Cresson Project <br /> .• <br /> Table 2:SPCC Cross-Reference <br /> 40 CFR(1) Requirement* Location in <br /> Plan <br /> 112.3(d) Have the SPCC plan certified by a registered professional engineer. Section 2.2 <br /> 112.3(e)(1) Maintain a copy of the plan at your Facility. Section 2.4 <br /> 112.3(e)(2) Have a copy of the plan on-Site for review by the Agency. Section 2.4 <br /> 112.4(a) Whenever your Facility discharges>1,000 gallons of oil in a single discharge or has <br /> two discharges of>42 gallons within 12 months,submit the information described Section 3.4.3 <br /> in 112.4(a)(1)-(9)to the regional administrator within 60 days. <br /> 112.4(c) Send to the State a copy of the information submitted to the regional administrator. Section 1.1 <br /> 112.4(d) Amend the plan if required to do so by the regional administrator. Section 2.5 <br /> 112.5(a) Amend the plan when there is any change that materially affects the potential for a <br /> discharge. Section 2.5 <br /> Implement any amendment within 6 months. <br /> 112.5(c) Have technical amendments certified by a registered professional engineer in <br /> Section 2.5 <br /> accordance with 40 CFR 112.3(d)except as provided in 40 CFR 112.6. <br /> 112.7 Management must give full approval to the plan and the authority to commit <br /> Section 2.1 <br /> resources. <br /> 112.7 The plan must either follow the sequence of§112.7; or must be an equivalent plan, <br /> which includes all applicable SPCC requirements,with a cross-reference to the 40 Table 2 <br /> CFR 112 requirements. <br /> 112.7(a)(1) Include a discussion of Facility's conformance with the requirements listed in Part <br /> Section 1.1.1 <br /> 112. <br /> 112.7(a)(2) Where the plan does not conform to the applicable requirements [see regulations], <br /> then: <br /> state the reasons for nonconformance, Section 1.2.2 <br /> describe in detail alternate methods and how equivalent environmental <br /> protection will be achieved. <br /> 112.7(a)(3) Describe the physical layout of the Facility, and include a diagram which shows the <br /> location and contents of each container. Section 4 <br /> Include completely buried tanks that are exempted from 40 CFR 112 Tables 3-10 <br /> requirements. Figures 3-9 <br /> • Include all transfer stations and connecting pipes. <br /> 112.7(a)(3) Address: <br /> (i) the type of oil in each container and its storage capacity; Tables 3-10 <br /> (ii) discharge prevention measures, including procedures for routine handling of <br /> Section 4 <br /> products; <br /> (iii) discharge or drainage controls around containers and other <br /> Section 4 <br /> structures, equipment, and other procedures for controlling a discharge; <br /> (iv) countermeasures for discharge discovery, response,and cleanup by the Facility <br /> Section 4 <br /> and that might be required of a contractor; <br /> (v) methods of disposal recovered materials in accordance with applicable legal <br /> Section 5.5.3 <br /> requirements; and <br /> (vi) contact list and phone numbers for the Facility response coordinator, National ERP under the <br /> Response Center, clean-up contractors,and all appropriate Federal,State, and local CONTACTS tab <br /> agencies. <br /> 112.7(a)(4) Provide information and procedures in your plan to enable a person reporting a <br /> discharge to provide the information described in 112.7(a)(4). Section 5.6 <br /> - --------- - . ............ _-------_. -.,_ ..,,. --- - ----- ------- --- - .- <br /> Department THIS DOCUMENT IS UNCONTROLLED IN HARDCOPY FORMAT Doc Id:NA CCV-SER PLAN- <br /> 1930 <br />
The URL can be used to link to this page
Your browser does not support the video tag.