Laserfiche WebLink
ResponseSpill <br /> NORTHNEWMONT Countermeasures Plan for the Cresson Project <br /> .. <br /> In accordance with 40 CFR Part 112.5(b) a complete review and evaluation of the Plan must be completed at least <br /> once every five years.Any necessary amendments, based on the review and evaluation, must be prepared within <br /> six months of the evaluation and implemented as soon as possible, but no later than six months following the <br /> preparation of the amendment.Scheduled reviews and Plan amendments are recorded in the Plan Review Log <br /> (Section 6).A signed statement must be prepared by the person conducting the evaluation,stating that a review <br /> and evaluation of this Plan was completed, and that the plan will or will not be amended as a result.This <br /> statement will be kept with the Plan as an attachment.A certified professional engineer must review and certify <br /> any technical amendments. <br /> 2.6 Cross-Reference with SPCC Provisions <br /> This Plan does not follow the exact order presented in 40 CFR Part 112.Section headings identify,where <br /> appropriate,the relevant section(s)of the SPCC Rule.Table 2 presents a cross-reference of Plan sections relative to <br /> applicable parts of 40 CFR Part 112. <br /> -------- ---- - - -- - <br /> Department THIS DOCUMENT IS UNCONTROLLED IN HARDCOPY FORMAT Doc Id:NA-CCV-SER-PLAN- <br /> ------- - ----------- - _----- 1930 <br />