My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-12-13_REVISION - M1980244 (58)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2019-12-13_REVISION - M1980244 (58)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2025 8:08:29 AM
Creation date
12/16/2019 1:10:51 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
12/13/2019
Doc Name Note
Appendix 1
Doc Name
Request For Amendment To Permit
From
CC&V
To
DRMS
Type & Sequence
AM13
Email Name
TC1
MAC
BFB
ERR
JPL
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Newmont Goldcorp-Cripple Creek&Victor Gold Mine <br /> Technical Specification No.01400 EARTHWORK CQA ■ <br /> VLF2 Phase 3 <br /> Project No.475.0106.033 <br /> December 5,2019 <br /> such as unsatisfactory test results, will be dealt with directly between the CQA MONITOR, and <br /> CONTRACTOR. The CQA MONITOR will also discuss any deficiencies with the CERTIFYING <br /> ENGINEER. <br /> If there is a disagreement among the DESIGN ENGINEER, CERTIFYING ENGINEER, and/or <br /> MANAGER that cannot be resolved among themselves, MANAGER shall present the matter to <br /> CC&V with MANAGER related recommendations and CC&V shall decide the matter with such <br /> decision being final. <br /> 4. PART 4: DEFICIENCIES <br /> When deficiencies (items that do not meet SPECIFICATIONS or DRAWINGS) are discovered, the <br /> CQA MONITOR will immediately determine the nature and extent of the problem and notify <br /> the CONTRACTOR. If unsatisfactory test results identify a deficiency, additional tests will be <br /> performed to define the extent of the deficient area. <br /> CONTRACTOR shall correct the deficiency to the satisfaction of the CQA MONITOR. If <br /> CONTRACTOR is unable to correct the problem, the CQA MONITOR will notify MANAGER and <br /> CERTIFYING ENGINEER which will assist in problem resolution. If the solution involves a design <br /> revision, the DESIGN ENGINEER shall also be contacted. <br /> The CQA MONITOR shall retest and the MANAGER and CERTIFYING ENGINEER shall approve <br /> the corrected deficiencies before any additional related work is performed by CONTRACTOR. <br /> All retests and related documentation shall be recorded by the CQA MONITOR and included in <br /> the Construction Certification Report. <br /> 5. PART 5: MEETINGS <br /> This section identifies and describes the meetings to be held during the course of the <br /> construction. Meetings shall be held in order to clearly define construction activities and goals <br /> in order to facilitate construction. <br /> 5.1. Preconstruction Meeting <br /> MANAGER will hold a preconstruction meeting at the site prior to the start of construction. <br /> MANAGER, DESIGN ENGINEER, CERTIFYING ENGINEER, CQA MONITOR, CONTRACTOR, <br /> and others designated by MANAGER shall attend this meeting. The purpose of this meeting will <br /> be to: <br /> ■ review the construction DRAWINGS, CQA Plan, and SPECIFICATIONS; <br /> ■ define the responsibilities of each party; <br /> ■ define lines of communication and authority; <br /> Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.