My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-12-13_REVISION - M1980244 (58)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2019-12-13_REVISION - M1980244 (58)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2025 8:08:29 AM
Creation date
12/16/2019 1:10:51 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
12/13/2019
Doc Name Note
Appendix 1
Doc Name
Request For Amendment To Permit
From
CC&V
To
DRMS
Type & Sequence
AM13
Email Name
TC1
MAC
BFB
ERR
JPL
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Newmont Goldcorp-Cripple Creek&Victor Gold Mine <br /> Technical Specification No.01400 EARTHWORK CQA <br /> VLF2 Phase 3 <br /> Project No.475.0106.033 <br /> December 5, 2019 <br /> 2.5. Construction Quality Assurance Monitor <br /> The CQA MONITOR is the firm or individual responsible for performing the CQA tasks outlined <br /> in this CQA Plan. The CQA MONITOR is the official CQA representative of CC&V and has the <br /> responsibility of overseeing the CQA aspects of the Work. In this CQA Plan the CQA MONITOR is <br /> associated with the CERTIFYING ENGINEER, and refers specifically to (To Be Determined). The <br /> CQA MONITOR has the authority to stop any aspect of the Work that is not in compliance with <br /> the CQA Plan. Work would then be resumed once corrective action has been approved by <br /> MANAGER. The specific responsibilities of the CQA MONITOR include: <br /> ■ review the DRAWINGS, SPECIFICATIONS, and related guidance documents; <br /> ■ review all CONTRACTOR QC submittals and make appropriate recommendations; <br /> ■ obtain preconstruction and construction samples and perform material evaluation testing <br /> as required; <br /> ■ monitor foundation preparation activities as discussed in Section 6.2.1 and material <br /> placement as discussed in Section 6.2.2; <br /> ■ assure that testing equipment used and tests performed are conducted according to <br /> SPECIFICATIONS and industry standards; <br /> ■ document and report test results to MANAGER; <br /> ■ report any deficiencies to MANAGER that are not corrected to the satisfaction of the CQA <br /> MONITOR, including design or SPECIFICATION changes; <br /> ■ prepare a Construction Certification Report describing the construction, any deviations from <br /> SPECIFICATIONS or DRAWINGS and details, details of all field and laboratory test data, tests <br /> results (both laboratory and field), professional certification that construction was <br /> completed in accordance with the DRAWINGS and SPECIFICATIONS. The Construction <br /> Certification Report will be signed and sealed by the CERTIFYING ENGINEER registered in <br /> the State of Colorado; <br /> ■ monitor the ambient air temperature and fill temperature, as outlined in Section 2200 of <br /> the SPECIFICATIONS; and <br /> ■ maintain an on-site soils laboratory and perform regular calibration of equipment. <br /> 2.6. Earthworks Contractor <br /> The Earthworks Contractor, also referred to as "CONTRACTOR", is responsible for proper <br /> processing, delivery and placement of all components as outlined in the SPECIFICATIONS. <br /> 3. PART 3: LINES OF COMMUNICATION <br /> The CQA MONITOR shall be capable of direct communication with MANAGER, DESIGN <br /> ENGINEER and CERTIFYING ENGINEER at all times. Deficiencies that can be easily remedied, <br /> Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.