My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-12-13_REVISION - M1980244 (58)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2019-12-13_REVISION - M1980244 (58)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2025 8:08:29 AM
Creation date
12/16/2019 1:10:51 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
12/13/2019
Doc Name Note
Appendix 1
Doc Name
Request For Amendment To Permit
From
CC&V
To
DRMS
Type & Sequence
AM13
Email Name
TC1
MAC
BFB
ERR
JPL
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Newmont Goldcorp-Cripple Creek&Victor Gold Mine ■ <br /> Technical Specification No.01400 EARTHWORK CQA . <br /> VLF2 Phase 3 <br /> Project No.475.0106.033 <br /> December 5, 2019 <br /> ■ review method of documentation, testing procedures, and reporting inspection data; <br /> ■ establish testing protocols and procedures for correcting and documenting construction <br /> deficiencies; <br /> ■ discuss any changes that may be needed to ensure that construction will be completed in <br /> compliance with the design; and <br /> ■ This meeting will be documented by MANAGER and copies will be distributed to all parties. <br /> 5.2. Progress Meetings <br /> MANAGER will hold a daily progress meeting, either before the start of work or at the <br /> completion of work. At a minimum, this meeting will be attended by the CQA MONITOR and <br /> CONTRACTOR. The purpose of this meeting will be to: <br /> ■ review all the previous day's accomplishments and activities; <br /> ■ review scheduled work location and activities for the day; <br /> ■ discuss any problems or potential construction problems; and, <br /> ■ review test data. <br /> 5.3. Deficiency Meetings <br /> Special meetings will be held, as needed, to discuss potential problems or deficiencies. At a <br /> minimum, these meetings will be attended by the CQA MONITOR and CONTRACTOR. If the <br /> problem relates to a design issue, MANAGER, DESIGN ENGINEER and CERTIFYING ENGINEER <br /> should also be present. The meeting will be documented by the CQA MONITOR. <br /> 6. PART 6: EARTHWORKS CONSTRUCTION QUALITY ASSURANCE <br /> Construction of the valley leach facility or specified earthworks shall be in accordance with the <br /> DRAWINGS and SPECIFICATIONS. A CQA monitoring and testing program shall be implemented <br /> by CC&V to ensure construction compliance by the CONTRACTOR. The CQA testing program <br /> shall consist of construction testing of materials used in the valley leach facility construction. <br /> The types of materials are defined in the SPECIFICATIONS. During construction, the CQA <br /> MONITOR shall sample and test these soil types to determine if they meet SPECIFICATIONS. The <br /> CQA MONITOR shall obtain and test soil samples in accordance with American Society for <br /> Testing and Material standards ASTM D75 and ASTM D420. All tests shall be performed by the <br /> CQA MONITOR on-site or in a geotechnical laboratory approved by the CERTIFYING ENGINEER. <br /> Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.