Laserfiche WebLink
/ <br /> y�x <br /> i 11 <br /> / /ari r / / <br /> 2/0 <br /> 1 <br /> Figure 11. Northern hole prepared for clean water flushing input directly adjacent to the <br /> generator Conex (out of frame to the right). Photo captured October 23, 2019; view to the <br /> east; man in yellow for scale. <br /> On Thursday, October 24', two pumps of roughly equal size were delivered by Rain for <br /> Rent. The first pump was tested and worked (Figure 12). The second pump did not work <br /> as it was rated for high flow and low pressure —the opposite required in this environment. <br /> Rain for Rent replaced that pump on the same day. The third Rain for Rent pump was the <br /> largest pump available in the Rain for Rent fleet. <br /> 18 <br />