My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-12-05_HYDROLOGY - M1999058 (4)
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1999058
>
2019-12-05_HYDROLOGY - M1999058 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2025 7:41:43 AM
Creation date
12/6/2019 7:46:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999058
IBM Index Class Name
Hydrology
Doc Date
12/5/2019
Doc Name
Oct. 11, 2019 Spill Report
From
Colorado Stone Quarries, Inc.
To
DRMS
Email Name
DMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br /> r,r <br /> ri r/i/ i <br /> 101 <br /> Figure 10. Water tank placement to receive pumped sump water. Photo captured <br /> Thursday, November 14, 2019; view to the south-southeast. <br /> On Wednesday, October 23, GLA and CSQ personnel prepared a Job Safety Agreement <br /> (JSA) to be understood and signed by every party participating in the clean-up activity. <br /> Following the adoption of the JSA, the initial pump supplied by United was unable to <br /> pump at the required pressure over the required elevation change. Arrangements were <br /> made for replacement pumps to be delivered by Rain for Rent based out of Rifle, <br /> Colorado. Also on Wednesday, CSQ and GLA concluded that Clean Harbors would not be <br /> able to manage and complete the mitigation operation as planned. Therefore, additional <br /> consultants were contacted and HRL Compliance Solutions, Inc. (HRL) conducted a site <br /> visit to assess its ability to complete the job. Following this initial site visit, HRL was <br /> chosen to assist with mitigation activities and to take over the long term sampling and <br /> remediation plan required by the state. <br /> Two holes were dug near the generator Conex to determine potential pathways for diesel <br /> to enter and potentially saturate the fill near the generators (Figure 11). One hole was <br /> located at the center of the northern face and a second adjacent to the western Conex face. <br /> Both holes were within 10 feet of the generator Conex. The western hole yielded diesel <br /> soaked soil to a depth of 2.5-3 feet and was observed via smell and mild staining. The <br /> northern hole yielded diesel soaked soil to a depth of 2.5-3 feet with less distinct, but still <br /> detectable, diesel odor at a depth of approximately 12 feet below the pad surface. It was <br /> determined due to the mild presence of diesel odor at depth that the northern hole would <br /> serve as the input location for water flushing, simple green injection, and final seasonal <br /> fill remediation of a Micro-Blaze application. <br /> 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.