Laserfiche WebLink
6.4.12 Exhibit L Spillway Slope Revetment Cost Worksheet page 4 of 6 <br /> AREA AREA THICKNESS VOLUME VOLUME MASS COST <br /> POND 2&3 INTERCONNECT [ft ] [yd ] [ft] [ft ] [yd ] [tons] [$] <br /> Type VL Rip Rap 0.0 0.0 1.0 0.0 0.0 0.0 $0.00 <br /> Type II Bedding for Type VL 0.0 0.0 1.0 0.0 0.0 0.0 $0.00 <br /> Soil Cement 2559.3 284.4 2.0 5118.6 189.6 $4,739.46 <br /> $4,739.46 <br /> AREA AREA THICKNESS VOLUME VOLUME MASS COST <br /> POND 2&3 OUTLET [ft ] [yd ] Ift] It'] [yd ] [tons] [$] <br /> Type VL Rip Rap 1395.6 155.1 1.0 1395.6 51.7 116.8 $5,256.62 <br /> Type II Bedding for Type VL 1395.6 155.1 1.0 1395.6 51.7 88.9 $2,844.88 <br /> Soil Cement 907.7 100.9 2.0 1815.3 67.2 $1,680.86 <br /> $9,782.36 <br /> AREA AREA THICKNESS VOLUME VOLUME MASS COST <br /> POND 4 INLET [ft ] [yd ] IN [ft ] [yd ] [tons] [$] <br /> Type VL Rip Rap 2819.6 313.3 1.0 2819.6 104.4 236.0 $10,620.48 <br /> Type II Bedding for Type VL 2819.6 313.3 1.0 2819.6 104.4 179.6 $5,747.80 <br /> Soil Cement 4263.8 473.8 2.0 8527.7 315.8 $7,896.02 <br /> $24,264.30 <br />