Laserfiche WebLink
6.4.12 Exhibit L Spillway Slope Revetment Cost Worksheet page 3 of 6 <br /> Rock Density 2.26 tons/yd3 UNIT COSTS <br /> Materials <br /> Beddinq Density 1.72 tons/yd3 6"Type VL $25.00 ton <br /> Type II Bedding $17.00 ton <br /> Installation <br /> 6"Type VL $20.00 ton Material & Installation <br /> Type II Bedding $15.00 ton Soil Cement $25.00 yd3 <br /> AREA AREA THICKNESS VOLUME VOLUME MASS COST <br /> POND II [ft ] [yd ] ft] [ft ] [yd ] [tons] [$] <br /> Type VL Rip Rap 1219.2 135.5 1.0 1219.2 45.2 102.0 $4,592.20 <br /> Type II Bedding for Type VL 1219.2 135.5 1.0 1219.2 45.2 77.7 $2,485.30 <br /> Soil Cement 1251.2 139.0 2.0 2502.4 92.7 $2,317.07 <br /> $9,394.57 <br /> AREA AREA THICKNESS VOLUME VOLUME MASS COST <br /> POND 2 &3 INLET [ft ] [yd ] IN [ft ] [yd ] [tons] [$] <br /> Type VL Rip Rap 1377.9 153.1 1.0 1377.9 51.0 115.3 $5,190.15 <br /> Type II Bedding for Type VL 1377.9 153.1 1.0 1377.9 51.0 87.8 $2,808.91 <br /> Soil Cement 1398.8 155.4 2.0 2797.6 103.6 $2,590.37 <br /> $10,589.42 <br />