Laserfiche WebLink
6.4.12 Exhibit L Spillway Slope Revetment Cost Worksheet page 5 of 6 <br /> AREA AREA THICKNESS VOLUME VOLUME MASS COST <br /> POND 4 OUTLET [ft ] [yd ] [ft] [ft ] [yd ] tons] [$] <br /> Type VL Rip Rap 3337.0 370.8 1.0 3337.0 123.6 279.3 $12,569.44 <br /> Type II Bedding for Type VL 3337.0 370.8 1.0 3337.0 123.6 212.6 $6,802.58 <br /> Soil Cement 1730.2 192.2 2.0 3460.4 128.2 $3,204.06 <br /> $22,576.08 <br /> AREA AREA THICKNESS VOLUME VOLUME MASS COST <br /> POND 5 INLET [ft ] [yd ] ft [ft ] [yd ] [tons] [$] <br /> Type VL Rip Rap 1364.2 151.6 1.0 1364.2 50.5 114.2 $5,138.43 <br /> Type II Bedding for Type VL 1364.2 151.6 1.0 1364.2 50.5 86.9 $2,780.92 <br /> Soil Cement 1411.0 156.8 2.0 2821.9 104.5 $2,612.89 <br /> $10,532.25 <br /> AREA AREA THICKNESS VOLUME VOLUME MASS COST <br /> POND 5 OUTLET [ft ] [yd ] [ft] [ft ] [yd ] [tons] [$] <br /> Type VL Rip Rap 1406.2 156.2 1.0 1406.2 52.1 117.7 $5,296.84 <br /> Type II Bedding for Type VL 1406.2 156.2 1.0 1406.2 52.1 89.6 $2,866.65 <br /> Soil Cement 2023.7 224.9 2.0 4047.4 149.9 $3,747.60 <br /> $11,911.09 <br /> AREA AREA THICKNESS VOLUME VOLUME MASS COST <br />