My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-11-20_PERMIT FILE - M2019057
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2019057
>
2019-11-20_PERMIT FILE - M2019057
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2020 1:39:09 PM
Creation date
11/20/2019 2:46:43 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2019057
IBM Index Class Name
PERMIT FILE
Doc Date
11/20/2019
Doc Name
Application
From
Jacom Ulrich
To
DRMS
Email Name
ERR
JDM
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. Map,Sketch or Drawing. Show location and layout of the area of operation. Identify any streams, creeks or springs if known. Show <br /> the size and kind of all surface disturbances such as trenches, pits, settling ponds, stream channels and run-off diversions, waste <br /> dumps, drill pads, timber disposal or clearance,etc. Include sizes, capacities,acreage, amounts,locations,materials involved, etc. <br /> Please see the attached maps: <br /> (EXHIBIT C)"Location"is taken from a PDF copy of the"Hackett Mountain Quadrangle,Colorado,7.5-Minute Series.The area of <br /> the claims is shown at a scale of 1:24,000,and includes all streams,creeks,springs and seasonal run off. <br /> (EXHIBIT B)"Disturbances"is an operator created map to show the current areas of interest being explored. Prospecting activities <br /> will primarily occur within these areas of interest but may also occur anywhere within the contiguous operation boundary. <br /> -Approximately 2 to 3 cubic yards of material will be moved per day,1 to 2 days per week or 35 to 40 days per year,for a total <br /> approximate material disturbance of 0.5 acres combined for all mining or prospecting activities,per mining season at all locations <br /> within the contiguous operation boundary.All holes are contemporaneously reclaimed. <br /> - No settling ponds,steam channels, run off diversions,waste dumps,drill pads, etc...are not required for this operation. <br /> -No timber(trees)will need to be cut or disposed of on this operation. <br /> -No vegetation will need to be removed or disturbed on a significant scale.Typically,less than 100 sqft per week,a <br /> portion of which is re-planted during the process of contemporaneous reclamation,see(EXHIBITD). <br /> - It is assumed that if an item or disturbance is not shown on the map or described in this MPO,that it is not need or required <br /> as part of this operation. <br /> (If more space is needed to fill out a block of information,use additional sheets and attach form) <br /> -3- <br />
The URL can be used to link to this page
Your browser does not support the video tag.