My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-11-01_PERMIT FILE - M2018063
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2018063
>
2019-11-01_PERMIT FILE - M2018063
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 1:47:14 PM
Creation date
11/1/2019 12:40:18 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2018063
IBM Index Class Name
Permit File
Doc Date
11/1/2019
Doc Name
Adequacy Review Response #2
From
Ellicott Sand & Gravel, LLC / Environment, Inc.
To
DRMS
Email Name
TC1
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT L <br /> RECLAMATION COSTS (revised 10/31/2019) <br /> The following Reclamation Cost estimate is based on the <br /> assumption that there will be restricted no more than 40 . 0 acres ± <br /> of disturbance at any-one time, as shown on the Mining Plan Map. The <br /> mine working face will be 500 feet long by an average of 35 feet <br /> high and would need cut/fill sloped at 14 . 16 yd/lft . Finish <br /> sloping on the 1, 675 feet of partially backfilled 2 : 1 slopes that <br /> averages 35 feet high at 5 . 68 yd/lft to complete the 3 : 1 slopes . <br /> Armoring will the be placed along 500 feet of the channel side <br /> slopes using 1 . 64 cubic yards/ linear feet (820 yd') of clean <br /> concrete rubble . The 30 acres will then be resoiled with an <br /> average of 5 . 5 inches of soil using a scraper to spread it and a <br /> blade to shape the seed bed. At that time we will have to respread <br /> 22, 185 cubic yards of topsoil and move 16, 600 cy of cut\fill <br /> sloping along the working face . The remaining 10 acres are <br /> partially reclaimed and are waiting grass to grow so may only need <br /> reseeding. The table below outlines the various areas of distur- <br /> bance at the time explained above . A D8N dozer is used to do the <br /> cut/fill sloping, a 631G scraper will resoil and complete bank <br /> sloping and a 140G Blade is used to shape the reclamation area . <br /> The mobilization haul distance is 25 . 0 miles at a average speed of <br /> 45 mph . The revegetation cost figure used includes fertilizer, <br /> grass seed, labor and drilling costs . <br /> STAGE TOTAL SOIL DEPTH <br /> NEEDING RES❑ILING 30.00 5.5 <br /> REVEGETATION AREA 30.00 <br /> RES❑IL @ 5.5'' 22, 1B5 CUBIC YARDS <br /> CUT/FILL SLOPING '/z: l 7,090 CUBIC YARDS <br /> BACKFILL SLOPING 9,51 O CUBIC YARDS <br /> BANK ARMORING B20 CUBIC YARDS <br /> SECONDARY REVEGETATION 33% <br /> ESTIMATED UNIT COSTS FOR RECLAMATION ITEMS: <br /> Unit Cost <br /> 1 . Revegetation areas includes grass seed, fertilizer <br /> and labor to drill . . . . . . . . . . . . $ 1, 500 . 00/AC . <br /> 2 . Re-spreading soil and/or growth media with <br /> 631 G Scraper, haul distance 800 ft or less. . . . . . . $ 0 . 5 8 3/YD3 <br /> 3 . Cut/fill working face 500 feet long by 35 feet high <br /> D-8 Dozer, push distance 100 ft or less. . . . . . . . $ 0 . 533/YD3 <br /> 4 . Backfill and shape 1675 feet long part reclaimed slope <br /> D-8 Dozer, push distance 100 ft or less. . . . . . . . $ 0 . 533/YD{ <br /> 5 . Place armoring along excavation . . . . . . . . $29 . 00/YD3 <br /> 6 . Shape seedbed 140G Blade at 1.75 acres per hour. . . . $ 83 . 99/AC <br /> 59 (revised 10.31/19) <br />
The URL can be used to link to this page
Your browser does not support the video tag.