Laserfiche WebLink
EXHIBIT L RECLAMATION COSTS (cont) <br /> RECLAMATION COSTS <br /> 1 . Revegetation, 30 . 00 ac @ $1500 . 00/ac $45, 000 . 00 <br /> la . Secondary revegetation 40 . 00 ac @ 33% <br /> $1500 . 00/ac 14, 850 . 00 <br /> 2 . Resoiling, 22, 185 yd' @ 58 . 8/yd' 14 , 476 . 49 <br /> 3 . Cut/fill highwall 7, 090 yd3 @ 53 . 3G/yd' 4, 348 . 94 <br /> 4 . Backfill slope 9, 510 yd' @ 53 . 3�/yd' 5, 074 . 61 <br /> 5 . Place armoring 820 yd' @ $29 . 00/yd' 23, 780 . 00 <br /> 6 . Shape seed bed 30 . 00 acres @ $59 . 54/ac 2, 519 . 84 <br /> Direct cost Total $110, 049 . 87 <br /> 7 . Indirect costs 14, 878 . 75 <br /> Mobilization 7, 015 . 00 <br /> 8 . Administration costs 6, 246 . 43 <br /> TOTAL ESTIMATE $138, 190 . 05 <br /> Recommend bond be set at $138,200.00 <br /> 60 (revised 10.31/19) <br />