My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-11-01_PERMIT FILE - M2018063
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2018063
>
2019-11-01_PERMIT FILE - M2018063
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 1:47:14 PM
Creation date
11/1/2019 12:40:18 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2018063
IBM Index Class Name
Permit File
Doc Date
11/1/2019
Doc Name
Adequacy Review Response #2
From
Ellicott Sand & Gravel, LLC / Environment, Inc.
To
DRMS
Email Name
TC1
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINING PLAN EXHIBIT D(CONT) <br /> There are no ditches crossing the site and no surface or <br /> subsurface water will be impacted by the mining operation. All <br /> interior pit slopes will be maintained with a pit-ward attitude <br /> so that historic drainage patterns can be maintained. This same <br /> slope management plan will prevent any offsite slides or other <br /> disruptions . Isolation berms or ditches will be constructed <br /> around the active mining area to prevent off site stormwater from <br /> contacting the disturbed area. All stormwater contacting the <br /> disturbed area will be retained on site and allowed to evaporate <br /> or soak into the underlying sand. No stormwater will be retained <br /> in the mine area for more then 72 hours . No dewatering will take <br /> place as this is a dry mine . A CDPS and stormwater permit will <br /> be obtained if needed. No U. S . Army Corps of Engineers 404 <br /> permit is necessary, as there are no water bodies on the site nor <br /> are there any wetland areas that will be disturbed by mining or <br /> reclamation. No mining will take place within the ephemeral <br /> drains of Black Squirrel Creek or Big Springs Creek. <br /> MINING TIMETABLE <br /> This estimated mining timetable is based on an average year <br /> and Ellicott Sand & Gravel LLC expects a specific year to vary <br /> widely from the average . If there are changes in the mining <br /> timetable we will discuss the reasons for the changes in the <br /> annual report that follows the change and modify it at that time. <br /> ESTIMATED MINING TIMETABLE (REVISED 7/2019) <br /> ACRES <br /> Stage ESTIMATED TOTAL TOTAL MINED MINED <br /> YEARS AREA MINED 100% SLOPES <br /> I 10-15 66. 1 49 . 9 22 . 3 27 . 6 <br /> II 15-20 213 . 7 173 . 0 124 . 7 48 . 3 <br /> III 4-6 54 . 2 39 . 2 9 . 7 29 . 5 <br /> IV 2-5 24 . 3 14 . 9 2 . 8 12 . 1 <br /> V 2-4 20 . 8 14 . 2 2 . 3 11 . 9 <br /> VI 1 20-30 1 268 . 4 1 222 . 3 1 151 . 5 1 70 . 8 <br /> Drainage LOM 86 . 2 0 . 0 0 . 0 0 . 0 <br /> Totals 52-80 733 . 7 513 . 5 313 . 3 200 . 2 <br /> 9 (revised 10.31/19) <br />
The URL can be used to link to this page
Your browser does not support the video tag.