Laserfiche WebLink
Cripple Creek&Victor Gold Mining Company ■■ <br /> Squaw Gulch VLF Phase 2A Part 2 ■ <br /> Record of Construction Report <br /> 475.0106.032 <br /> October 24,2019(Revision 1) <br /> Figure 4 Destructive Sample Test Codes for Extrusion Welds with Leister Heat <br /> Seams <br /> LIST OF APPENDICES <br /> Appendix A Staff Schedule for CQA Monitor Personnel <br /> Appendix B Surveyor's Professional License <br /> Appendix B.1 Edward James Surveyor's Professional License <br /> Appendix B.2 Foresight West Surveyor's Professional License <br /> Appendix C Technical Specifications <br /> Appendix D Structural Fill Method Specifications <br /> Appendix E Soil Liner Fill Acceptance Forms <br /> Appendix F Weekly Reports <br /> Appendix G Photographic Documentation <br /> Appendix G.1 Photograph Log <br /> Appendix G.2 Construction Photographs <br /> Appendix H Laboratory Test Results <br /> Appendix H.1 Structural Fill Laboratory Test Results <br /> Appendix H.2 Leak Detection Fill Laboratory Test Results <br /> Appendix H.3 Soil Liner Fill Laboratory Test Results <br /> Appendix H.4 Drain Cover Fill Laboratory Test Results <br /> Appendix I Geosynthetics Quality Control Documents and Inventory <br /> Appendix 1.1 Geomembrane Inventory Control <br /> Appendix 1.1.1 40mil LLDPE Geomembrane Inventory Control <br /> Appendix 1.1.2 80mil LLDPE Geomembrane Inventory Control <br /> Appendix 1.2 Resumes of Installation Personnel <br /> Appendix 1.3 Geomembrane Roll QC Certificates <br /> Appendix 1.3.1 40mil LLDPE Geomembrane Roll QC Certificates <br /> Appendix 1.3.2 80mil LLDPE Geomembrane Roll QC Certificates <br /> Appendix 1.4 Geomembrane Resin QC Certificates <br /> Appendix 1.4.1 40mil LLDPE Geomembrane Resin QC Certificates <br /> P:\Projects\0106.032 VLF2 Phase 2 COA\1-REPORTS\Cert Report-Phase 2A Part 2\DRMS Comments\475.0106.032 CCV PHASE 2A Part 2 <br /> ROC REPORT revl.doa <br />