Laserfiche WebLink
Cripple Creek&Victor Gold Mining Company Ell■ <br /> Squaw Gulch VLF Phase 2A Part 2 ■ <br /> Record of Construction Report <br /> 475.0106.032 <br /> October 24,2019(Revision 1) <br /> Appendix 1.4.2 80mil LLDPE Geomembrane Resin QC Certificates <br /> Appendix 1.5 Welding Rod Quality Control Certificates <br /> Appendix 1.6 Geotextile Roll Quality Control Certificates <br /> Appendix J Geomembrane Installation Summaries <br /> Appendix J.1 Geomembrane Deployment Summary <br /> Appendix J.2 Geomembrane Trial Seam Summaries <br /> Appendix J.2.1 Geomembrane Fusion Trial Seam Summary <br /> Appendix J.2.2 Geomembrane Extrusion Trial Seam Summary <br /> Appendix J.3 Geomembrane Fusion Welding Summary <br /> Appendix J.4 Geomembrane Extrusion Welding Summary <br /> Appendix J.5 Geomembrane Destructive Testing Summaries <br /> Appendix J.5.1 Geomembrane Fusion Destructive Testing Summary <br /> Appendix J.5.2 Geomembrane Extrusion Destructive Testing Summary <br /> Appendix J.6 Geomembrane Pressure Testing Summary <br /> Appendix J.7 Geomembrane Defect/Repair Summary <br /> Appendix J.8 Geomembrane Acceptance Forms <br /> Appendix K Third Party Geomembrane Conformance Testing Results <br /> Appendix K.1 40mil LLDPE Geomembrane Conformance Testing <br /> Appendix K.2 80mil LLDPE Geomembrane Conformance Testing <br /> Appendix L Tensiometer Certifications <br /> P:\Projects\0106.032 VLF2 Phase 2 CCW\J-REPORTS\Cert Report-Phase 2A Part 2\DRMS Comments\475.0106.032 CCV PHASE 2A Part 2 <br /> ROC REPORT revl.docx <br />