Laserfiche WebLink
Cripple Creek&Victor Gold Mining Company <br /> Squaw Gulch VLF Phase 2A Part 2 ■ <br /> Record of Construction Report <br /> 475.0106.032 <br /> October 24,2019(Revision 1) <br /> RECORD OF CONSTRUCTION DRAWINGS <br /> Sheet No. 1 of 4 SOIL LINER FILL AS-BUILT 1 OF 4 <br /> ➢ Sheet No. 2 of 4 SOIL LINER FILL AS-BUILT 2 OF 4 <br /> ➢ Sheet No. 3 of 4 SOIL LINER FILL AS-BUILT 3 OF 4 <br /> ➢ Sheet No. 4 of 4 SOIL LINER FILL AS-BUILT 4 OF 4 <br /> ➢ Sheet No. 1 of 4 LEAK DETECTION TRENCH AS-BUILT <br /> ➢ Sheet No. 1 of 4 HIGH VOLUME COLLECTION PIPE AS-BUILT 1 OF 4 <br /> ➢ Sheet No. 2 of 4 HIGH VOLUME COLLECTION PIPE AS-BUILT 2 OF 4 <br /> ➢ Sheet No. 3 of 4 HIGH VOLUME COLLECTION PIPE AS-BUILT 3 OF 4 <br /> Sheet No. 4 of 4 HIGH VOLUME COLLECTION PIPE AS-BUILT 4 OF 4 <br /> DRAWING NO. 10 GEOMEMBRANE PANEL LAYOUT AS-BUILT <br /> ➢ DRAWING NO. 11 DRAIN COVER FILL AS-BUILT ISOPACH <br /> LIST OF TABLES <br /> Table 1 Summary of Earthworks Material Specifications <br /> Table 2 Earthworks Testing Summary and Frequency <br /> Table 3 Summary of Weather Data <br /> Table 4 Fill Temperature Monitoring Summary <br /> Table 5 CQA Earthworks Laboratory Testing Summary—Structural Fill <br /> Table 6 CQA Earthworks Laboratory Testing Summary— Leak Detection Fill <br /> Table 7 CQA Earthworks Laboratory Testing Summary—Soil Liner Fill <br /> Table 8 CQA Earthworks Laboratory Testing Summary— Drain Cover Fill <br /> Table 9 Nuclear Gauge Moisture-Density Testing Summary—Soil Liner Fill <br /> Table 10 Soil Liner Fill Depth Verification Summary <br /> LIST OF FIGURES <br /> Figure 1 Site Location <br /> Figure 2 Certification and Geomembrane Installation Limits <br /> Figure 3 Destructive Sample Test Codes for Dual Hot Wedge Fusion Welds <br /> P:\Projects\0106.032 VLF2 Phase 2 CQA\J-REPORTS\Cert Report-Phase 2A Part 2\DRMS Comments\475.0106.032 CCV PHASE 2A Part 2 <br /> ROC REPORT revl.docx <br />